background image

ARGENT BATH FILLERS

1.  INSPECT ALL PARTS PRIOR TO INSTALLATION FOR SUITABILITY AND/ OR DEFECTS
2.  ANY SUSPECTED DEFECT SHOULD BE REPORTED AS SOON AS POSSIBLE
3.  SHOULD ANY PRODUCT BE INSTALLED DESPITE A FAULT HAVING BEEN FOUND AND REPORTED, ARGENT WILL 

NOT ACCEPT LIABILITY FOR THE COST OF LABOUR TO REMOVE AND INSTALL ANY REPLACEMENT PRODUCT/S

NOTES PRIOR TO INSTALLATION

Argent Bath Filler

Care & Installation Guide

Technical Hotline  

 

  

 

 

Customer Central 

   

      [email protected]

1800 356 717 

 

 

 

 

 

1300 364 748 

 

 

                       www.argentaust.com.au

1.  For new installations, install the rough in body in the designated place so that the base is 50-55mm below 

the finished floor height. For retro fit installations, CHASE A CHANNEL IN THE FLOOR IN THE designated place 

for the ROUGH IN base. (50-55mm depth)  Ensure that the plastic cover is installed level to the finished floor 

surface.

2.   Connect the hot and cold water feed pipes using thread seal tape or equivalent. Red = Hot, Blue = Cold
3.   Mark and secure the rough in body using all four fastening points, check that the rough in body is true and 

level when tightening the bolts. Use shims to level if required.

4.   Leave the plastic blanking plate in place for wet seal test. 
5.   Ensure there is a 95mm clearance hole around the rough in body while backfilling or tiling the floor

IN FLOOR BODY ROUGH IN

Please direct any feedback for this 

product to Customer Central: 

[email protected]

or call 1300 364 748

WMKT21008

3718

1.  PLEASE ENSURE PIPEWORK IS FLUSHED CLEAR OF DEBRIS BEFORE 

INSTALLING ROUGH IN BODY AND BATH FILLER.

2.  INLET PRESSURE RANGE 100 – 500KPA
3.  MAXIMUM HOT WATER TEMPERATURE 60 C
4.  AS/NZS 3500 REQUIRES 500 KPA MAXIMUM OPERATING PRESSURE AT 

ANY OUTLET WITHIN A BUILDING

5.  HOT & COLD INLETS SHOULD HAVE EQUALISED WATER PRESSURES.
6.  NOT SUITABLE TO BE INSTALLED WITH A GRAVITY FEED SYSTEM

NOTES FOR INSTALLATION

STEP1

STEPS 2&3

STEPS 4&5