
Apply epoxy into the hinge holes of
the leading edge.
Apply epoxy to the other side of the hinges.
Install the control surfaces.
Move the surface up and down a couple of times to make sure all the hinges are aligned correctly and the
desired throw is attained (Aileron:40degrees,others:45degrees)
Use some masking tape to hold the surfaces together until all of the surfaces are secure in place with
epoxy.
Hinge the Elevator and Rudder with the same way.
.Landing
.Landing
.Landing
.Landing
Gear
Gear
Gear
Gear
Installation
Installation
Installation
Installation
Main
Main
Main
Main
Landing
Landing
Landing
Landing
Gear
Gear
Gear
Gear
Insert the wheel axle through the center hole of the wheel.