background image

Update Documentation 

P521/EN AD/B21

MiCOM P521

Page 11/24

CB Open Alarm?

Yes

Enables / Disables the maximum CB operations function.

Select Yes or No.  If the user selects (Yes), the following

menu is displayed.  If the user selects (No) the CB

Operations supervision function is disabled (go to

Σ

Amps(n) menu).

CB Open NB =

0

Selects the maximum number of CB operations.  Select
from 0 to 50000 in steps of 1 using 

8

 or 

2

 and

validate your choice using 

5

.

Σ

Amps(n)?

Yes

Enables / Disables the Summation Amps (or square Amps)

interrupted by the CB function.  Select Yes or No.  If the

user selects (Yes), the following menu is displayed.  If the
user selects (No) the CB 

Σ

Amps(n) function is disabled (go

to t Open Pulse menu).

Σ

Amps(n)?

1000 E6

Selection of the summation Amps (or square Amps) alarm

threshold.  Select from 0 to 4000 E6 A (or A2) in steps of 1
E6 using 

8

 or 

2

 and validate your choice using 

5

.

n  

 1

Selection of the type of summation (Amps or square

Amps).  Select 1 for just Amps or 2 for Amps squared
using 

8

 or 

2

 and validate your choice using 

5

.

t Open Pulse

100 ms

Selection of the tripping pulse time.  Select from 100 ms to
5 s in steps of 100 ms using 

8

 or 

2

 and validate your

choice using 

5

.

t Close Pulse

100 ms

Selection of the closing pulse time.  Select from 100 ms to
5 s in steps of 100 ms using 

8

 or 

2

 and validate your

choice using 

5

.

CB Man Trip Dly

0 ms

Selects the circuit breaker manual tripping delay.  Select
from 0 to 60s in steps of 0.1s using 

8

 or 

2

 and validate

your choice using 

5

.

CB Man Close Dly

Selects the circuit breaker manual closing delay.  Select
from 0 to 60s in steps of 0.1s using 

8

 or 

2

 and validate

your choice using 

5

.

Содержание MiCOM P521

Страница 1: ...MiCOM P521 Current Differential Relay Software Version 1 D Update Documentation P521 EN AD B21...

Страница 2: ......

Страница 3: ...rom the menu description 3 5 4 8 57 58 Inverting of the auxiliary output relays New section added 57 Inputs sub menu Section re numbered was 3 5 4 8 3 5 4 9 58 AUTOMAT CTRL menu description amended 3...

Страница 4: ...amended 5 8 74 Unconditional 4 wire pilot communications for distances greater than 1 2km P595 Note amended P521 EN CM B11 9 3 2 32 Protection comms fault Figure 2 amended P521 EN MC B11 2 3 Definiti...

Страница 5: ...y illuminated and the watchdog contact will operate If the fault is minor no influence on the protection and automation function e g SCADA communication failure the WARNING LED flashes This will not c...

Страница 6: ...ing 8 or 2 and enable your choice using the 5 key Clock Source Ch1 INTERNAL Displays the source of the protection comms clock Select from INTERNAL or EXTERNAL using 8 or 2 and enable your choice using...

Страница 7: ...nvert output relay RL7 Select Yes or No 3 5 4 9 Inputs sub menu This sub menu makes it possible to allocate any of the 5 logic inputs to either a label or an automation function The available selectio...

Страница 8: ...nu To gain access to the Inputs menu press 2 6 6 times 2 followed by 6 10 times Inputs Heading of the Inputs sub menu To gain access to the sub menu content press 2 Input 1 None Allocation of logic in...

Страница 9: ...settings AUTOMAT CTRL Heading of the AUTOMAT CTRL Menu To gain access to the Cold Load PU menu press 2 6 6 times 2 followed by 6 12 times Cold Load PU Heading of the Cold Load PU sub menu To gain acc...

Страница 10: ...ct Yes Select No if the user does not wish to associate tIe with the cold load pick up function Validate your choice using 5 Cold Load PU tIe No Associates the Ie time delay threshold with the cold lo...

Страница 11: ...r failure sub menu The CB Fail sub menu makes it possible to enable the circuit breaker failure detection function and its associated settings AUTOMAT CTRL Heading of the AUTOMAT CTRL Menu To gain acc...

Страница 12: ...s disabled go to CB Open Time menu t Trip Circuit t SUP 200 ms Selects the Trip circuit supervision time Select from 0 1 s to 10s in steps of 10 ms using 8 or 2 and validate your choice using 5 CB Ope...

Страница 13: ...on of the summation Amps or square Amps alarm threshold Select from 0 to 4000 E6 A or A2 in steps of 1 E6 using 8 or 2 and validate your choice using 5 n 1 Selection of the type of summation Amps or s...

Страница 14: ...dc and 180Vdc Between 19 2Vdc and 300Vdc 25Vac and 300Vac 50 60Hz Between 19 2Vdc and 180Vdc Between 19 2Vdc and 300Vdc Special ENA variants are intended for UK applications which require compliance w...

Страница 15: ...th including RS485 RS232 socket SK1 2 0kVrms for one minute between all terminals of each independent circuit grouped together and all other terminals including RS485 RS232 socket SK1 1 0kVrms for one...

Страница 16: ...trip circuit failure is generated if the opto input detects no voltage signal for a time longer than the settable timer tSUP AUTOMAT CTRL CB Supervision The 52 Fail contact can be selectively closed i...

Страница 17: ...upervision current bypasses the trip coil via the 52b contact thus trip coil supervision is not provided whilst in this condition If the circuit breaker is open a fault in the trip path will only be d...

Страница 18: ...485 up to 10 kilometres it is necessary to use the P595 see PZ511 publication AFS 12 05940 1098EN interfacing device at each end of the line To gain maximum performance of the P521 the data rate must...

Страница 19: ...REVA T D PZ511 interface except that the P595 has accessible setting switches The switch settings to allow communications between P521 relays can be found in the modem configuration document P521 EN M...

Страница 20: ...each of the relays If the protection comms alarm resets then the fault is with the communications link not the relays The relays should assist with diagnosing the location of the fault by indicating...

Страница 21: ...Application of P520L loopback test box If the fault is with the active part of the relay withdraw the active part and return it to the factory for repair If the fault is with the communications modul...

Страница 22: ...ems protocol converters and line drivers DTE Data Terminal Equipment i e PCs terminals and protection relays Handshaking Confirmation and status signals sent between communicating devices in order to...

Страница 23: ...ase in situ If however the fault is on the protection communications card the whole relay including the relay case needs to be sent back for repair The P520 loopback test box facilitates the fault loc...

Страница 24: ...trip and close commands from operating simultaneously Modification to summation amps function in order to improve measurement accuracy Correction to fault records to include the magnitude of negative...

Страница 25: ...P521 EN AD B21 Update Documentation Page 23 24 MiCOM P521 Relay Software Version 1 1 Setting File Software Version...

Страница 26: ...dard 1 E F Current 0 1 40 on A 0 01 8 on B 0 002 1 on C Protection Communication EIA232 A EIA485 B 850nm C 1300nm multi mode D 1300nm single mode E Auxiliary Power Supply Digital Input Voltage 24 60 V...

Страница 27: ......

Страница 28: ...TRANSMISSION DISTRIBUTION Energy Automation Information energy automation information areva td com www areva com Publication P521 EN AD B21...

Отзывы: