background image

Original User Manual 

 A

REBO

S Cable Hoist 

 

11 

 

 

   10. Mounting plan 

 

 
Correct steel cable winding method 

 

   11. Maintenance and cleaning 

 

Disconnect the power plug 

prior 

to performing any 

work 

on the device.

 

 

Clean the device using 

damp 

cloth 

and 

some 

liquid 

soap. 

Never use 

cleaning agents or 

solvents, 

these 

could 

damage the device's plastic parts. 

 

Regularly inspect the total length of the steel cable for damages as well as the functionality of 

the limit 

bracket 

(Wind 

cable winch 

until the limit 

weight

 

activates 

the limit bracket 

of 

the 

limit 

switch). 

 

If the 

steel cable 

is damaged (split or bent)

professional must replace it using 

original 

replacement parts. 

 

During assembly of the cable, it is imperative to remember the limit weight in order to 

ensure a secure limit stop. 

 

Inspect the free movement of all mechanical components after the power plug has been 

disconnected. 

 

Replace lost parts only with original parts. 

 

Pay attention to professional recycling at the end of the life cycle. 

 
 
 
 
 

Содержание AR-HESW100

Страница 1: ...Original User Manual AREBOS Cable Hoist 1 Cable Hoist Please follow all security measures in this user s manual to ensure a secure use Thank you for trusting in AREBOS...

Страница 2: ...afety instructions 4 4 Construction 6 5 Technical specifications 7 6 Area of application 8 7 Installation and operation 8 8 Problem solving 9 9 Electric principle drawing 10 10 Mounting plan 11 11 Mai...

Страница 3: ...not meet the requirements the lifting force must be reduced In case of malfunctions please contact us or get qualified specialists 2 Explanations of the symbols On the basis of a CE marking it can be...

Страница 4: ...idden to transport people with the device Before commissioning you have to do idle tests and check the points below Whether the double direction switch works well and the hook moves up and down Whethe...

Страница 5: ...each task first run in jog mode until the steel cable is pulled tight Only then start up It is strictly forbidden to start the steel cable directly without pulling it The limit switch is a safety dev...

Страница 6: ...th deviating shaft 5 Limit weight 6 Power cord 7 Mounting casing 8 Motor 9 Emergency Off switch 10 Operating switch Up Down 11 Steel bar not included in the delivery 12 Down limit bracket for limit st...

Страница 7: ...Upper and Lower device When the load weight is raised and makes contact with the end switch stop ring the end switch will stop the circuit for safety When the load weight is lowered and the steel rop...

Страница 8: ...here is rain water damage a dry treatment must be carried out so that the insulation resistance is more than 0 5M Prior to start up operation please be sure to make some preparations Make sure the vol...

Страница 9: ...the end switch and replace the limit switch 6 Wait until the item cools down or replace the thermal switch The dual direction switch has been activated The motor is very loud can however not pick up t...

Страница 10: ...Original User Manual AREBOS Cable Hoist 10 9 Electric principle drawing AR HE SW100 AR HE SW200 AR HE SW300 AR HE SW400 AR HE SW500...

Страница 11: ...e for damages as well as the functionality of the limit bracket Wind cable winch until the limit weight activates the limit bracket of the limit switch If the steel cable is damaged split or bent a pr...

Страница 12: ...ld waste at the end of its life Collection points for waste electrical and electronic equipment are available free of charge in your area You can obtain the addresses from your city or local governmen...

Страница 13: ...9 4260199757505 4260199757512 Should the appliance be modified without our consent this declaration of conformity will lose its validity Tested acc to Reference to the harmonized standards EN 14492 2...

Отзывы: