Table. 5.5.1 - 234. Register content.
Date
and time
Event code
Trigger currents
Time to
CTSact
Ftype
Used
SG
dd.mm.yyyy
hh:mm:ss.mss 3328-3459 Descr.
The phase currents (L1, L2 & L3), the
residual currents (I01 & I02), and the
sequence currents (I1 & I2) on trigger time.
Time
remaining
before the
function is
active.
The status
code of the
monitored
current.
Setting
group
1...8
active.
5.5.2 Voltage transformer supervision (60)
Voltage transformer supervision is used to detect errors in the secondary circuit of the voltage
transformer during fuse failure. This signal is mostly used as an alarming function or to disable
functions that require adequate voltage measurement.
Figure. 5.5.2 - 222. Secondary circuit fault in phase L1 wiring.
The following figure presents a simplified function block diagram of the voltage transformer
supervision function.
A
AQ
Q-G215
-G215
Instruction manual
Version: 2.04
345
Содержание AQ-G215
Страница 1: ...AQ G215 Generator protection IED Instruction manual ...
Страница 399: ...Figure 7 4 241 Example block scheme A AQ Q G215 G215 Instruction manual Version 2 04 398 ...
Страница 421: ...Figure 8 14 264 Panel cutout dimensions and device spacing A AQ Q G215 G215 Instruction manual Version 2 04 420 ...
Страница 456: ...10 Ordering information A AQ Q G215 G215 Instruction manual Version 2 04 455 ...