![ARCO LI-2B Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/arco/li-2b/li-2b_owners-manual_2964743012.webp)
Out-Swing Installation
In this type of installation the gate swings outward away from the LI-2B operator to the open
position.
Several factors must be considered to determine the most suitable arm length. These
include
•
The drive through width required
•
The placement of the gate operator
•
The location of the gate on the pier/post
For assistance (if required) please provide a drawing (mud map) of your situation showing all
possible measurements.
Possible measurements include width between piers/posts, size of piers/posts, single or
double gates, position of hinges on piers/posts etc.
Note: The polarity of the motor connections may need to be reversed for out-swing
operation. See overload section.
LI-2B Installation Manual
Содержание LI-2B
Страница 7: ...LI 2B Installation Manual ...
Страница 20: ...LI 2B Installation Manual ...
Страница 22: ......