MH-3621-U3 Clone 2.5”/3.5”Dual SATA HDD Docking System Installation Guide
- 11 -
STEP3: Press & hold the clone button for at least three seconds, and clone operation will
start having the RED Power LED disappear and all 4 LEDs turned on in orange.
STEP4: Following light-on of all 4 LEDs in orange, LEDs will then proceed to running back
& forth indicating the clone progress. Each orange LED refers to every 25% of
clone completion. It is only when every 25% of HDD1 is cloned to HDD2 that such
LED will remain constantly on, leaving the other LED(s) in running stage. When
Clone operation is fully completed, all LEDs will flash regularly in orange color
until device is power cycled.
archgon