Arch Environmental Equipment CTS 9000 IRRD Скачать руководство пользователя страница 2

TYPE:  CTS 9000 IRRD  

INSTALLATION AND OPERATION

  

 

Tools Required For Installation: 

The following tools are required for the installation of the belt misalignment unit : 
1.   Drill and extension. 
2.   ½ Inch Diameter Drill Bit. 
3.   2 x 9/16 inch wrenches. 
4.   Adjustable Wrench. 
5.   6mm flat screw driver. 
6.   3mm flat screw driver. 

 
Installation: 

To install the CTS 9000 IRRD drill ½” holes into the conveyor structure matching the holes 
on the CTS 9000 IRRD base plate, place the CTS 9000 IRRD on the conveyor structure 
over the holes and bolt it down with supplied bolts.  To connect the CTS 9000 IRRD, refer to 
the CTS 9000 IRRD Control Box Wiring Diagram, and connect a cable to the COM terminal 
and the N/O (Normally Open) or N/C (Normally Closed) contact depending on the 
application. 
 
 

 

ph 220VAC

ph 110VAC

N

1

2

3

4

WASH

TRIP

LED1

LED2

LED1

LOCK

OUT

RESET P/B

WASH P/B

N/O

COM

N/C

Operation: 

If an object is protruding through the belt as it passes the CTS 9000 IRRD it will break the 
infrared beam and the unit will trip.  If there is a longitudinal rip in the conveyor belt material 
will fall onto the catch plate which then builds up and breaks the infra-red beam causing the 

Отзывы: