
How to Operate the System – Activating the Backpack
3. Position Toggle Valve in the neutral location (center) before
turning on the backpack.
AccuFlo Soil Injector ISD
Training Manual
Valve toggle in neutral position
4. Activate Backpack pump by turning the Variable Speed dial
clockwise to the highest setting.
When the backpack is first activated, it
will begin to prime the supply line, but will
not fill cylinder chamber until toggle valve
is moved to “fill” position. (next page)
Fluid level must be above the supply and drain
line ports in order for the backpack to run.
Содержание AccuFlo 070-3100
Страница 1: ...USER MANUAL...
Страница 17: ...Exploded Views Part Numbers...