![Arbiter Systems Portable Power Sentinel 933A Скачать руководство пользователя страница 129](http://html1.mh-extra.com/html/arbiter-systems/portable-power-sentinel-933a/portable-power-sentinel-933a_operation-manual_2962845129.webp)
Sliding Reference
Set the Reference Format to Sliding when you want to follow daily
variations in voltage or current that do not require a trigger unless it
exceeds the expected rate of change.
For example, if due to usage
requirements the line voltage sags during the day and swells during the
night, you might want to use a sliding reference to avoid unnecessary
triggers. A sliding reference would generate a trigger only if the voltage
unexpectedly sags or swells at a rate greater than expected.
Calculating a Sliding Reference Voltage
Per the specification IEC61000-4-30, the sliding reference voltage is
calculated by using equation 7.1; it is of first-order and uses a one-minute
time constant.
(7.1)
U
sr
(
n
)
= 0
.
9967
×
U
sr
(
n
−
1)
+ 0
.
0033
×
U
(10
/
12)
rms
Where
U
sr
(
n
)
is the present value of the sliding reference voltage;
U
sr
(
n
−
1)
is the previous value of the sliding reference voltage; and
U
(10
/
12)
is the most recent 10/12-cycle r.m.s. value.
Note that even though the specification defines the input signal (U) as a
voltage, it has been applied in the 933A to include measured input currents,
as calculated using the same formula, with U as a current.
Logging Time
There are two available settings of which you can choose to control how the
933A logs one-second data when a trigger becomes active: MaxLogTime,
and PostFault.
MaxLogTime
: defines the number of seconds to record data during which
the specific trigger is active (i.e. faulted). Setting MaxLogTime to 10
seconds will cause the 933A to record 10, once-per-second records after a
trigger becomes active.
PostFault
: defines the number of seconds that the 933A records data
after the trigger becomes inactive (i.e. after the fault has disappeared).
111
Содержание Portable Power Sentinel 933A
Страница 16: ...B 3 Uploader Progress Window 165 B 4 Successfully Uploaded File Information 166 xvi ...
Страница 18: ...xviii ...
Страница 35: ...Figure 2 2 Front Panel Description 17 ...
Страница 128: ...Figure 7 9 Power Quality Reference Selection Softkey Figure 7 10 Configuring the Power Quality Reference 110 ...
Страница 163: ...Chapter 10 Connection Diagrams 145 ...