background image

 

3.  Any solder joints near the valve must be done before connecting any piping to the valve.  Always leave at least 6" (152 mm) 

between the valve and joints when soldering pipes that are connected to the valve.  Failure to do this could cause damage to 
the valve. 

4.  If the valve is not installed on the tank, cut the 1” central pipe flush with top of each tank.  Lubricate the large o-ring on the 

valve that seals against the tank.  Screw the valve on to the tank.  Be careful to not cross thread the valve into the tank.  Only 
use silicone lubricant. 

5.  Connect the drain line to the valve. 
6.   Connect  the  brine  line  from  the  valve  to  the  air  check  /  safety  elbow  as  per  figure  8.    Double  check  to  make  sure  all 

connections are assembled correctly and the brass and plastic nuts are tight and secure to prevent leaks. 

7.   Add water until there is approximately 1" (25 mm) of water above the grid plate.  If the tank does not have a grid, add water 

until it is above the air check in the brine tank.  Do not add salt to the brine tank at this time. 

8.   Place the unit in the bypass position. 
9.   Slowly turn on the main water supply. 
10.  At the nearest cold treated water tap nearby remove the faucet screen, open the faucet and let water run a few minutes or 

until the system is free of any air or foreign material resulting from the plumbing work.  Close the water tap when water runs 
clean, then proceed to start up instructions. 

 

BRASS NUT

BLUE LOCKING CLIP

 

PLASTIC NUT

3/8” PLASTIC TUBE
INSERT

 

Figure 8. Brine Line Connections View

 

 
Start up Procedure

  

 
1.  Plug the valve into an approved power source. 
2.  When power is supplied to the control, the screen will display TIME OF DAY and DEFAULT GALLON SETTING. If the valve is not 

in service it will read “CANATURE” while the valve returns to the service position.  

3.  If the system has been inactive, you may have to hold and press ‘ ’ until you hear a beep to unlock the display screen.  Press 

“      ” to initiate a manual regeneration and advance the valve to the Backwash position.  Open the inlet on the bypass valve 
slowly and allow water to enter the unit. Allow all air to escape from the unit before turning the water on fully then allow 
water to run to drain for 3-4 minutes or until all media fines are washed out of the softener or filter. 

4.  Press the “     ” to advance to the BRINE position.  Check the water level in the brine tank to insure the valve is drawing brine 

properly. 

5.  Press the “     ” to advance to the RINSE position.  Check the drain line flow.  Allow the water to run for 3-4 minutes or until the 

water is clear. 

6.  Press the “     ” to advance to the REFILL position.  Check that the valve is filling water into the brine tank. Allow the valve to 

refill for the correct amount of time as displayed on the screen to insure a proper brine solution for the next regeneration. 

7.   Press the “       ” to advance to the SERVICE position. Open the outlet valve to the bypass, then open the nearest treated water 

faucet and allow the water to run until clear, close the tap and replace the faucet screen. 

8.  Put salt into the brine tank.  
 

Control Operation During A Power Failure  
 

In the event of power failure, the valve will keep track of the time and day for 48 hours.  The programmed settings are stored in a 
non-volatile memory and will not be lost during a power failure.  If power fails while the unit is in regeneration, the valve will 
return to the service position once power is restored.  If the valve misses a scheduled regeneration due to a power failure, it will 
queue a regeneration at the next regeneration time once power is restored. 
 
 

Содержание CAN165-100

Страница 1: ...r Operation Manual Note 1 Read all instructions carefully before operation 2 Avoid pinched o rings during installation by applying provided with install kit NSF certified lubricant to all seals Rev 12...

Страница 2: ...ons 3 Introduction 4 Programming 5 General System Installation 7 Start up Instructions 7 System Configuration 8 Maintenance 9 Power Head Valve Exploded View 11 Power Head Parts List 12 Control Valve E...

Страница 3: ...433 living in the 5 2925 1825 1275 945 725 568 home 6 2850 1750 1200 870 650 7 2775 1675 1125 795 Softener could be undersized if of people and hardness line up in this shaded area 8 2700 1600 1050 Co...

Страница 4: ...e Figure3 Valve Display Figure 3 Valve Display System Initialization When power is supplied to the control the screen will display TIME OF DAY AND DEFAULT GALLON SETTING If the valve is not in service...

Страница 5: ...and press until you hear a beep to unlock the display screen Press or to select which setting to modify 2 To change setting press When the display flashes the value may be changed Press or to change t...

Страница 6: ...e drain 10 BRINE This option controls the length if time in minutes for the unit to draw regenerant brine for softeners from the second tank and slowly rinse it from the top to bottom of the tank 11 R...

Страница 7: ...d 120 psi water pressure Do not exceed 110 F water temperature Do not subject unit to freezing conditions Figure 6 Piping Diagram Installing the Bypass valve Figure 7 Bypass Assembly View 1 Locate the...

Страница 8: ...ALLON SETTING If the valve is not in service it will read CANATURE while the valve returns to the service position 3 If the system has been inactive you may have to hold and press until you hear a bee...

Страница 9: ...tically bypassed for use in the household Hot water should be used as little as possible during this time to prevent hard water from filling the water heater This is why automatic regeneration is set...

Страница 10: ...solvents Never subject your softener to freezing or to temperatures above 120 F Figure 12 Injector Assembly Cleaning the Injector Assembly Sediment salt and silt will restrict or clog the injector A...

Страница 11: ...11 Power Head Exploded View See parts listing on next page 12...

Страница 12: ...w ST2 9 10 5 B16 5056504 Bnt165 Pcb 1 B17 5056500 Bnt165 Front Cover 1 5056505 Bnt165 Operation Label 1 5056506 Bnt165 Regen Label 1 B18 5056509 Screw ST2 9 10 CSK 2 B19 5056082 Screw M3 5 2 B20 50565...

Страница 13: ...13 Control Valve Exploded View See parts listing on next page 14...

Страница 14: ...C onnect or 1 A 26 13000426 S crew S T2 9 13 Large W af er 2 A 27 05056038 D rai n Fi t t i ng 1 A 28 26010003 O R i ng 18 2 65 1 A 29 05056036 D LFC B ut t on R et ai ner 1 A 30 05056079 O R i ng 15...

Страница 15: ...egeneration frequency 3 Inlet of control plugged due to foreign material Remove piston and clean control valve 1 Air in water system Check well system for proper air eliminator control 2 Incorrect dra...

Страница 16: ...proof of purchase or installation is provided and then the warranty period shall be from the date thereof Ten Year Warranty on Mineral Tanks and Brine Tanks Canature North America Inc will provide a r...

Отзывы: