8. Measure and cut pipe to appropriate length and glue 1” MPT x 1”
slip fitting to end of pipe using PVC glue (not included).
10. Place spillway in position on wall block making sure spillway is
level front to back and left to right.
Optional WaterWall lighting:
If installing optional spillway
lighting: Insert light into position beneath spillway lip. Insert the acrylic
diffuser tray into place by sliding onto the spillway lip. The low voltage
cable of the light strip can exit either side of the spillway.
Note:
A lintel may be required across spillway to help support wall
cap. Depending on the style and size of pavers used
Optional WaterWall lighting:
Run the light cord down back of
wall or through wall cavity if building a two-sided wall. A groove may
need to be cut to provide space for plumbing to run down through wall.
11. Modify wall block to allow for spillway lip and body of spillway to
sit within the wall.
9. Use Teflon tape on threads of fitting at end of pipe and thread
spillway onto to end of pipe.
I N S T A L L A T I O N I N S T R U C T I O N S
☎
US 1-866-877-6637 |
☎
CAN 1-866-766-3426 | www.aquascapeinc.com
12. Place spillway into modified wall.
13. Place wall cap across spillway
14. Fill basin with water. Place pump access cover and splash pad
on top of basin. Decorative gravel can be used to help disguise the
remaining top of basin not covered by splash pad.
I N S T A L L A T I O N I N S T R U C T I O N S