background image

Step 5  

If media is already in the MEDIA TANK proceed to Step 6. 

If media is shipped separately, follow these steps to center the distributor tube and load the fi lter media into the media tank to ensure the successful 
installation of your MCA Series Iron Reduction System.

a. 

Remove the control valve by rotating the valve head assembly to the left or counter-clockwise and set aside to reassemble after media is loaded into 
the tank.

b. 

Tilt media tank to a 45 degree angle until gravel shifts to the side of the tank and dimple at bottom of media tank is visible.  This will allow you to place the 
distributor tube basket assembly in the dimple on the bottom of the media tank.  

c. 

Place media tank back in upright position and ensure gravel at the bottom of the media tank is level. Place centering tool on the distributor tube that is pro-
vided in the parts bag.

d. 

Locate the fi lter media that will be used in the iron reduction system and load into the media tank. Note: Never add media above line indicated on 
side of tank. You may have received more media than required for the initial fi ll, save extra media for future replenishment. When fi nished adding 
media, remove centering tool. Using a pail or garden hose slowly fi ll the media tank to the top to displace any air from the tank. Use a clean rag to 
wipe the opening of the media tank to remove any dust or sediment before moving to the next step.

e. 

Place the control valve on top of the media tank. Engage the threads of the control valve into the threads of the media tank. Turn the valve clockwise 
until it seats onto the media. Ensure a water tight seal by turning the valve another quarter turn.

 CAUTION

To reduce the risk associated skin, eye, and respiratory tract irritation from gravel and fi lter media during installation:

•  Gravel and several types of fi lter media may be used in this product, depending upon the application.  During installation, dust may cause irritation to skin, eyes, 

and respiratory tract.

•  Utilize a NIOSH-approved dust fi lter mask, protective gloves, and appropriate eye protection when handling and pouring gravel and fi lter media.
•  To request an MSDS relating to this product, call 203-238-8965 or go to www.3M.com , select country, and use the search engine to search MSDS.  For emergen-

cies, call 800-364-3577 or 651-737-6501 (24 hours).

Step 6

Turn off the electrical source to the water well pump or the close the water shut off 
valve on a municipal water supply to the dwelling once again. Depressurize the water 
system by opening the nearest faucet to drain water from the water system in order to 
allow the installation of the MCA Series Iron Reduction System. 

Step 7

Determine location and cut the water line on the supply side of the pressure tank as 
required to fi t the plumbing to the control valve connection fi ttings. You may want to in-
stall a separate three valve bypass prior to the control valve in case the supplied bypass 
valve requires maintenance in order to provide undisturbed water use.

Step 8

Assemble and attach bypass valve to the control valve. See Figure 4 if needed. Make 
certain the water enters inlet and discharges through the outlet side of the bypass 
valve. Arrows can be viewed on the bypass valve to confi rm the correct fl ow path. 
At this time make certain the bypass valve is in the bypass position and leave in that 
position until instructed to place in the service position. Refer to Figure 4 for proper 
operation.

CAUTION

CAUTION

To reduce the risk associated with property damage due to water leakage:

• 

Do not

 use torches or other heat sources near plastic plumbing, as damage may occur.

•  Take care when using pliers or pipe wrenches to tighten plastic fi ttings, as damage may occur.
•  On plastic fi ttings, use thread sealing tape only.  Never use pipe sealant or pipe dope on plastic fi ttings, as damage may occur.

Step 9

Loosen set screw and pull out drain line fl ow control (DLFC) assembly from valve body (see Figure 4). Unscrew drain line elbow from DLFC. Apply PTFE 
tape to threads. Reassemble to valve body, making certain DLFC assembly is fully inserted into valve body before tightening set screw.

Attach drain line to drain line fi tting. To prevent back pressure from reducing fl ow rate below minimum required for backwash, drain line must be sized 
according to run length and relative height. Be careful not to bend fl exible drain tubing sharply enough to cause “kinking” (if kinking occurs drain line 
MUST be replaced!).

3-3

Figure 4 . INLET/OUTLET CONNECTIONS

BYP

A

SS

BYP

A

SS

BYPASS VALVE

CLIP & SCREW

FLAT CAP

SERVICE

YOKE

CONTROL VALVE BODY

FILL PORT

ADAPTER

OUT IN

SET SCREW

BYPASS

DRAIN LINE
ELBOW

FLOW CONTROL ASSEMBLY

ROTATE

KNOBS

Содержание MCA SERIES

Страница 1: ... OPERATING INSTRUCTIONS MCA SERIES RESIDENTIAL IRON REDUCTION SYSTEMS MODELS MCA1001 MCA1001M MCA1501 MCA1501M MCA2001 MCA2001M INSTR2804 0312 Installer please leave with homeowner Homeowner retain for future reference ...

Страница 2: ... and pouring gravel and filter media To request an MSDS relating to this product call 203 238 8965 or go to www 3M com select country and use the search engine to search MSDS For emergen cies call 800 364 3577 or 651 737 6501 24 hours CAUTION To reduce the risk associated with property damage due to water leakage Read and follow Use instructions before installation and use of this water treatment ...

Страница 3: ...the Hydro Charged water to precipitate throughout the media bed rather than on the surface as in chemical oxidizing filters This process produces an iron reduction capacity of 30 000 to 50 000 parts per million ppm com pared to 6 000 to 8 000 ppm for chemical oxidation processes The media DOES NOT require a chemical regenerant such as potassium permangante for oxygen enrichment salt chlorine or an...

Страница 4: ...t install a pressure limiting valve Contact a plumb ing professional if you are uncertain how to check your water pressure NOTE Call your local water department or plant operator to obtain pressure readings If you have a private well the gauge on the pressure tank will indicate the high and low system pressure Record your water pressure data below Water Pressure Low psi High psi CAUTION To reduce ...

Страница 5: ...ion if required may be taken Installation Site Selection Select the location of your iron reduction system with care Various conditions which contribute to proper location are as follows 1 Locate as close as possible to water supply source 2 Locate as close as possible to a drain 3 Locate in correct relationship to other water conditioning equipment Figure 1 page 3 1 4 Locate the iron reduction sy...

Страница 6: ...es Iron Reduction System Facts to Remember While Planning The Installation 1 All installation procedures MUST conform to local and state plumbing codes 2 If lawn sprinklers a swimming pool or geothermal heating cooling or water for other devices activities are to be treated by the iron reduction system a larger model MUST be selected to accommodate the higher flow rate plus the backwashing require...

Страница 7: ... control valve brand used WATER SOFTENER IRON REDUCTION SYSTEM SOFT WATER TANK SWITCH PRESSURE PRESSURE WATER RAW METER WATER FOR LAWN SPRINKLERS OR OTHER HIGH DEMAND HIGH DEMAND OR OTHER LAWN SPRINKLERS WATER FOR PRESSURE SWITCH WELL WATER RAW PRIMARY PRESSURE SWITCH SECONDARY SECONDARY TANK CHECK VALVE PRESSURE OUTPUT SOLENOID VALVE TO 110 V PRIMARY TANK PRESSURE PRESSURE SWITCH TANK PRESSURE OU...

Страница 8: ...t of the Hydro Charger Check for leaks and adjust as necessary IMPORTANT NOTES IMPORTANT NOTES Do not apply heat near Hydro Charger as damage may occur On badly scaled older plumbing systems it may be advantageous to install a WYE Strainer to help prevent plugging of the Hydro Charger nozzle with scale or debris The use of a WYE Strainer must precede the Hydro charger on the inlet side by a minimu...

Страница 9: ...he search engine to search MSDS For emergen cies call 800 364 3577 or 651 737 6501 24 hours Step 6 Turn off the electrical source to the water well pump or the close the water shut off valve on a municipal water supply to the dwelling once again Depressurize the water system by opening the nearest faucet to drain water from the water system in order to allow the installation of the MCA Series Iron...

Страница 10: ...ion slowly open the inlet side of the bypass valve to allow water to flow into the filter vessel Water should start to flow into the drain Allow for any air that might have been trapped to leave the filter and go to drain This will be detected by changes in noise in the drain line or is visible in the semi transparent tubing Once the air is entirely gone slowly increase the water flow to drain by ...

Страница 11: ... on split stream installations 3 On both types installation install hyrdo charger between pressure tank secondary pressure tank on split stream type installation and normally closed solenoid valve 4 Install pressure switch after hydro charger and wire it to solenoid valve secondary pressure switch on split stream Set high pressure on pressure switch which controls opening and closing of solenoid v...

Страница 12: ...ater utilizing a hose or clean bucket Dispose of spent media in accordance with federal state and local regulations 5 Prior to reattaching valve head assembly to the tank inspect the o ring for wear If none lubricate with silicone grease or water Reattach valve head assembly by rotating to the right or clockwise until valve head assembly is seated to the tank hand tight 6 Reattach the bypass valve...

Страница 13: ...Refer to schedule and locate box intersected by 4 in family and 8 ppm iron The figure 1 in box indicates a backwash frequency of one time per 12 days if a 2 3 or 4 were in box frequencies of twice three times and four times per twelve days respectively would be indicated NOTE The backwashing frequency schedules are based on average water consumption rates and are merely guides They are NOT intende...

Страница 14: ... 2 2 3 1 1 1 1 2 2 2 3 3 3 4 1 2 1 2 2 2 3 3 4 4 5 1 2 1 2 2 3 3 4 4 6 6 1 2 2 2 3 3 3 4 6 6 7 2 2 3 3 3 4 6 6 6 12 8 2 3 3 3 4 6 6 6 12 12 MODELS MCA2001 MCA2001M Persons in Family IRON CONTENT PPM 5 10 12 14 16 18 20 22 24 26 28 30 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 2 2 2 2 2 3 1 1 1 2 2 2 2 2 2 2 3 3 4 1 1 2 2 2 2 2 3 3 3 3 3 5 1 2 2 2 2 3 3 3 3 4 4 4 6 1 2 2 3 3 3 3 4 4 4 6 6 7 1 2 3 3 ...

Страница 15: ...wn after rinse water stops flowing to drain HOW TO ADJUST BACKWASH TIME 1 Disconnect the power source 2 Locate the three screws behind the manual backwash knob by pushing the red button in and rotating the 24 hour dial until each screw appears in the cut out portion of the manual backwash knob 3 Loosen each screw slightly to release the pressure on the time plate from the 24 hour gear 4 Locate the...

Страница 16: ...time that your filter will rapid rinse 2 min per pin To change the length of rapid rinse add or remove pins at the higher numbered end of this cycle as required See note below The number of pins times two equals the rapid rinse time in minutes The backwash cycle is complete when the outer micro switch drops off the last pin in the rapid rinse group of pins The program wheel however will continue t...

Страница 17: ... from bypass valve Remove control valve from media tank by grasping the control valve and turn counter clockwise 5 Using a yard stick measure media level Remember media should be down 16 17 inches from the top of the media tank 6 If media is down 2 3 inches siphon water from tank and add ph Plus to return the level to the proper depth When the media level is below 20 inches from the tank top reple...

Страница 18: ...rloaded with precipitated iron due to insufficient backwash or failure to backwash due to problem with control timer or unplugged control valve power cord 2 Upon correction of problem increase backwash fre quency if problem determined to be insufficient frequen cy manually backwash until backwash water starts to clear in more severe iron fouling cases media bed may need chemical cleaning contact d...

Страница 19: ...6 40 6 75 190 5 Approximate Shipping Weight lbs kg 157 71 2 210 95 2 264 119 7 Maximum operating temperature 100º F 38º C Electrical requirements 110V 60Hz Operating pressure 20 100 psi Specifications are subject to change without notice NOTES 1 Replenishment of pH adjusting component of media may be required periodically the frequency of which is dependent on raw water pH manganese concentration ...

Страница 20: ...se Models M MC 050P 2 MC 050MP 2 MC 050P 3 MC 050MP 3 MC 050P 4 MC 050MP 4 7 Gravel Underbed QC 15P QC 15P QC 18P 8 Hydro Charger Complete HC10 HC10 HC10 9 Air Check Cap HC10 2 HC10 2 HC10 2 10 Air Check HC10 10 HC10 10 HC10 10 11 O ring Bypass Screw HC10 4 HC10 4 HC10 4 12 Bypass Screw HC10 5 HC10 5 HC10 5 13 Screw Retainer HC10 6 HC10 6 HC10 6 14 Nipple 1 NPT Qty 2 Includes Items 16 18 PKNPL100 ...

Страница 21: ...7 3 CEC1000 SERIES BACKWASH CONTROL ...

Страница 22: ...ms 66 N N 60160 00 Drive Cam Assy White O 10025X FAS Switch Assy Optional Incl Ref Items 66 68 P 19367 Cover Mounting Screw 2 18660 O Ring 3 18661 O Ring ORG 218 13 18706 02 3 4 NPT Adapter Yoke 18706 1 NPT Adapter Yoke 14 13709 Adapter Coupling 15 13305 Coupling O Ring 16 13255 Adapter Clip 17 13314 Screw Adapter Coupling 18 15058 Control Valve Body CEC1000 19 12112 Hex Head Machine Screw 20 1189...

Страница 23: ... SET SWITCH WHITE BLUE RAPID RINSE BRINE TANK FILL BACKWASH PROGRAM SWITCH BRINE AND RINSE BROWN BLACK BLACK BLACK YELLOW BLACK B L A C K B L A C K SWITCH SERVICE CAM SERVICE CAM RAPID RINSE BRINE RINSE BROWN YELLOW RED BLUE RED BLACK WHITE GREEN BACKWASH DRIVE CAM SERVICE DRIVE CAM SWITCH PLUG 120 V A C 60 CYCLE 7 5 ...

Страница 24: ...ification Inc s exclusive obligation Warranty Period One 1 year on the entire product unit Five 5 years on the media tank only does not include internal component parts Five 5 years on the control valve Five 5 years on salt storage container and components Limitation of Liability 3M Purification Inc will not be liable for any loss or damage arising from this 3M Purification Inc product whether dir...

Отзывы: