
Step
15
S
Finished
front edge
Finished
front edge
F
Fit the Right Side to the
Base
Attach the Right Side to
the Base using two
40mm Screws.
Fit the Left Side
Attach the Left Side to
the Base using two
40mm Screws.
7
6
Step
16
A
A
A
A
A
A
Finished
front edge
Prepare the Top
Screw 6 Metal Dowels
into the Top.
Fit the 2 Brackets from
the Overbalance
Protector Kit to the
shallow mark-holes
drilled into the Top using
1 of their Screws.
Note:
Only fit 1 of the
Screws, the other 1 will
be fitted later.
Step
17
8
F
F
F