Aqua-Hot™ Hydronic Heating System Installation Manual 07/05
Page 47
Installing the
Expansion
Tank
3.24 Installing the Aqua-Hot’s Expansion Bottle
The selected mounting location for the Expansion Bottle should allow for easy access
(i.e., for filling) and clear visibility whenever the particular Storage Bay door is open.
1. Mount the Expansion Bottle, as illustrated in Figure 30.
2. Connect and clamp the Overflow Tubing from the Expansion Bottle to the
Aqua-Hot’s Filler Neck Overflow Connection; reference Figure 30.
NOTE:
The Expansion Bottle can be mounted either above or below the top of the
Aqua-Hot.
3. Drill a hole in the Bay floor and connect (secure with a clamp) a large enough piece
of Overflow Tubing so that it can be connected to the top of the Expansion Bottle
and extend through the Bay floor; reference Figure 30.
FULL HOT
FULL COLD
NOTICE:
Use only a non-toxic Propylene Glycol based
Boiler Antifreeze. For more information call
1-800-685-4298
Filler Neck
Overflow
Connection
Tension
Clamp
Overflow
Tube
Tension
Clamp
Expansion
Bottle
Overflow
Tube
Overflow Tube
hole in Bay
Floor
Figure 30
SECTION 3: INSTALLATION PROCEDURES
Содержание AHE-100-04S-12 VDC
Страница 1: ...Installation Manual Model Numbers AHE 100 04S 12 VDC AHE 130 04X 12 VDC...
Страница 61: ...Wiring Diagrams APPENDIX A...
Страница 66: ...Wire Gauge Information APPENDIX B...