Copyright © 2016 Aqua Creek Products All Rights Reserved
Revised 12/13/16
Patriot Solar Charger Installation
MOUNTING BRACKET (4)
1/4" X 2-1/2" HEX BOLT (6)
1/4" FLAT WASHER (12)
1/4" NYLOCK NUT (6)
RUBBER THREAD CAP
MAIN FRAME
ACTUATOR
FRAME
BATTERY CABLE RUNS
BEHIND MAIN FRAME &
UP ACTUATOR FRAME
BEHIND CONTROL BOX
NOTE: THE BATTERY CABLE
RUNS ALONG THE MAIN FRAME
AND UP THE ACTUATOR FRAME
SO IT MOVES UP & DOWN WITH
THE LIFT.
TIGHTEN BOLTS
& NUTS WITH
7/16" WRENCHES
To install the Solar Charger on a Patriot lift;
STEP 1: Put the lift in operation mode on the pool deck.
STEP 2: Find the RUBBER THREAD CAP and install over the mounting stud.
STEP 3: Using the MOUNTING BRACKETS (4) and supplied hardware, attach the Solar Charger to the
handle as shown above. Tighten hardware with 7/16” wrenches or sockets until snug. The Solar Charger
should be solid and stable when the brackets are fully installed.
STEP 4: Run the BATTERY CABLE behind the main frame and up the ACTUATOR FRAME. The CONNECTOR
is on the CONTROL BOX (see INSTALLING THE CHARGE CONNECTOR).
4