4
NEW CONSTRUCTION: ANCHOR INSTALLATION
When the lift is installed on a new deck, t
he
s
l
a
b
s
houl
d
be
a
mi
ni
mum
of
6”
[
15
cm] thick at the
l
i
f
t
l
oc
a
t
i
on,
a
nd
s
houl
d
be
r
ei
nf
or
c
e
d
wi
t
h
#4
r
ei
nf
or
c
i
ng
ba
r
a
t
10”
[
25.
4c
m]
on
c
e
nt
e
r
i
n
e
a
c
h
direction. The total pad area should be 3 feet [92cm] wide (from the edge of the pool back) by 3
feet [92cm] long.
1. Locate the preset anchor jig assembly and the four (4) anchor bolts. Mount the anchor
bolts to the jig plate as shown in
FIGURE 2
.
2. Ground the jig plate using the attached bronze grounding lug. Check local codes for
anchor grounding.
3. Locate the jig assembly at the desired pool location. The setback distance must be no
greater than
23”
(
F
-004PLB-23)
or
26”
(F-004PLB-26)
as shown in
FIGURE 3
.
Make sure to keep the front two anchor holes parallel to the pool wall.
4. Make sure the anchor assembly is plumb and level
–
secure the anchors, and then
pour the deck.