Copyright © 2017 Aqua Creek Products All Rights Reserved
Revised 12/4/17
Pro Pool & Ranger Installation
REMOVE THIS
1/2" HEX BOLT
AT-SERIES
PRO POOL
OR RANGER
THREAD INTO
ANCHOR INSERT
TIGHTEN W/
1" WRENCH
BATTERY CABLE
RUNS BACK, ALONG
MAIN FRAME &
UP ACTUATOR-
FRAME, BEHIND
CONTROL-BOX
MAIN
FRAME
ACTUATOR FRAME
CONTROL BOX
CHARGE
CONNECTOR
PLUGS INTO
CONTROL BOX
NOTE: RUN BATTERY CABLE AS SHOWN;
ALONG MAIN FRAME & UP ACTUATOR
FRAME - TO MAKE SURE IT MOVES WITH
THE LIFT AS IT GOES UP AND DOWN.
To install the Solar Charger on a Pro Pool-AT or Ranger-AT lift;
STEP 1: Remove the 1/2” hex bolt from the baseplate as shown above.
STEP 2: Place the 24V Solar Charger over the baseplate of the lift as shown.
STEP 3: Align the mounting stud with the baseplate & anchor insert. Thread the mounting stud into the
anchor insert and tighten. Use a 1” wrench to make sure it is snug.
STEP 4: Run the BATTERY CABLE under the MAIN FRAME TUBE as shown. It will run to the CONTROL BOX,
and the CONNECTOR will plug into the control box.
(See INSTALLING THE CHARGE CONNECTOR).
3