APsystems Microinverter DS3 series Installation manual
14
4. APsystems Microinverter System Installation
4.3.10 Step 10 - Complete the APsystems installation map
a. Each APsystems Microinverter has 2 removable serial number labels.
b. Complete the installation map by sticking the ID label of each microinverter in the right location.
c. The second serial number label, could be stuck on the solar module frame, which could help later to
confirm the position of the microinverter without dismantling the PV module
Figure 13
①. The layout of the microinverters' serial number installation map is only suitable for a typical
installation.
②. Installation Map is available in the last page appendix of this manual.
③. Use ECU_APP (available in the EMA Manager) to scan the serial numbers on the map when setting up
the ECU (see ECU instruction manual for more info).
4.3.11 Step 11 - Warning Notice
A warning notice must be placed in such a way that anyone with access to live parts is warned in advance of the
need to switch off these parts. It is imperative to verify that the power supply, measurement circuits (sense lines)
and other parts are not isolated from the network when the interface protection switch is open.
As a minimum, warning labels shall be placed:
On the switchboard (DNO panel and consumer unit) that has the PV generator connected to it;
On all switchboards in between the consumer unit and the PV generator itself;
On, or in the PV generator itself;
At all points of isolation for the PV generator