AP006 P20
B
PREPARATION FOR INSTALLATION
The installation of the geared-motor requires a series of preparatory operations on the gate to be automated, if the gate is already installed, at the installation
site; it is therefore necessary to prepare the equipment that will give the installer maximum autonomy.
WARNING
The list of tools necessary is given in the figure, including the table, (B9)
BASIC EQUIPMENT AND DISPOSABLE MATERIAL REQUIRED
-
Electric disk grinder: 230V
-
Protective goggles
-
Electric welder: 230V/100 Amp minimum
-
Protective mask
-
Electrodes minimum dia. 2
-
Soft soldering iron
-
Electric drill: 230V
-
Drill bits
-
Cup milling cutter dia. 67 for photocell and push-button housing holes
-
Extension cable for electrical equipment
-
Electric cable 1.5 mm 2 in various various types of cable terminals
-
Electrician’s scissors
-
Cable terminal grippers
-
Tester
-
Calliper in twentieths
-
Measuring stick
-
Protractor
-
Dynamometer
.
S
O
P
/
E
L
I
S
N
E
T
U
L
O
O
T
/
L
I
T
U
O
/
G
U
E
Z
K
R
E
W
S
O
I
L
I
S
N
E
T
U
/
1
5
,
2
y
e
k
n
e
ll
A
5
,
2
e
l
â
m
n
e
ll
A
C
5
,
2
l
e
s
s
ü
l
h
c
s
s
u
b
m
I
5
,
2
o
h
c
a
m
n
e
ll
A
e
v
a
l
L
G
A
S
U
G
A
S
U
5
,
2
/
0
8
2
2
4
o
i
h
c
s
a
m
a
l
o
g
u
r
b
a
e
v
a
i
h
C
4
y
e
k
n
e
ll
A
4
e
l
â
m
n
e
ll
A
é
l
C
4
l
e
s
s
ü
l
h
c
s
s
u
b
m
I
4
o
h
c
a
m
n
e
ll
A
e
v
a
l
L
G
A
S
U
G
A
S
U
4
/
0
8
2
3
3
1
a
t
a
n
i
b
m
o
c
e
v
a
i
h
C
3
1
h
c
n
e
r
w
n
o
i
t
a
n
i
b
m
o
C
3
1
e
é
n
i
b
m
o
c
é
l
C
3
1
l
e
s
s
ü
l
h
c
s
i
b
m
o
K
3
1
a
t
a
n
i
b
m
o
c
e
v
a
l
L
3
1
/
5
8
2
G
A
S
U
4
i
n
r
e
t
s
e
r
e
g
e
e
s
r
e
p
a
z
n
i
P
s
g
n
i
r
p
a
n
s
l
a
n
r
e
t
x
e
r
o
f
r
e
p
p
i
r
G
s
e
r
u
e
i
r
é
t
x
e
r
e
g
e
e
s
s
e
u
g
a
b
r
u
o
p
s
e
c
n
i
P
r
e
g
e
e
s
n
e
ß
u
A
r
ü
f
e
g
n
a
Z
s
e
r
o
i
r
e
t
x
e
n
ó
i
c
n
e
t
e
r
e
d
s
o
ll
i
n
a
a
r
a
p
a
z
n
i
P
8
2
1
G
A
S
U
0
1
/
P
÷
5
2
Содержание ONDA 500
Страница 26: ...T2 Installation instructions GB ...