Installing the External Bypass Module

Step 5

Power up the SCE 2000 platform, as explained in 

Basic SCE 2000 Platform Operations, page 7-1

.

Verify that the relevant GBE interfaces of the SCE 2000 platform are now in sync, as the External Optical 
Bypass module is now active (in bypass), and is performing a loopback on these interfaces.

Auto-Negotiation should be configured identically for the two SCE 2000 platform GBE interfaces and 
the GBE interfaces of the switch/router on either side of the External Optical Bypass module. It is 
recommended that the two GBE interfaces of the SCE 2000 platform, as well as the GBE interfaces of 
the switch/router on either side of the External Optical Bypass module, be configured to 

Auto-Negotiation = OFF 

Step 6

Connect the control cable (supplied in the kit) from the Bypass 9-pin D-Type connector on the rear panel 
of the SCE 2000 platform to the Control connector on the External Optical Bypass module.

The SCE 2000 platform immediately starts providing power to the External Optical Bypass module, so 
the bypass module becomes inactive, and starts transferring the traffic to the SCE 2000 platform. The 

No Bypass 

” LED should therefore be lit.

Figure A-5

 displays the external optical bypass module connectivity.

Figure A-5

External Optical Bypass Module Connectivity

LINK RX

Cisco SCE 2000 

Series

4xGBE

TX

RX

MM

TX

LINK RX TX

RX

MM

TX

LINK RX TX

RX

MM

TX

LINK RX TX

RX

MM

TX

GBE-1

SUB

LINE

NET

PWR B

STATUS

PWR A

BYPASS

GBE-2

SUB LINE/CASCADE NET

Switch

External optical

bypass module

Switch

Subscriber

92809

Network

Switch

Power

Power

GBE

GBE

GBE

GBE

External optical

bypass module

Switch

GBE

link

GBE

link

Subscriber

Network

Содержание SCE 2000

Страница 1: ...servation of the network GBE link in two additional important scenarios Complete loss of power in the SCE 2000 platform The SCE 2000 platform includes redundant Power Supply Units and redundant power feeds in both the DC and AC versions However in case either both PSUs fail or both power feeds stop providing power to the SCE 2000 platform simultaneously the network link will be preserved by the Ex...

Страница 2: ...ass module or in case the power cable is disconnected from the optical bypass module the External Optical Bypass module becomes active bypassing the two GBE links to the SCE 2000 platform and thus preserving network connectivity Figure A 3 illustrates the operation of the bypass module when it is inactive not in bypass The data traffic is simply transferred through the bypass module to the SCE 200...

Страница 3: ...the SCE 2000 platform The SCE 2000 platform controls the External Optical Bypass module via this connection by the presence or absence of electrical power Pigtail fiber connectors Four fiber cables that connect to the GBE link ports on the front panel of the SCE 2000 platform NET Tx NET Rx SUB Tx SUB Rx No Bypass LED ON Bypass module is not active GBE traffic flows through the SCE 2000 platform OF...

Страница 4: ...lowing procedure describes how to install the module in a 19 rack Note that although each module is shipped with its own mounting panel it is not necessary to install each module in a separate mounting panel Up to three modules may be installed in one mounting panel Step 1 Using the screws attached to the module screw it into an empty position in the mounting panel Step 2 Secure the module panel t...

Страница 5: ...changes Connect the fiber steps 3 and 4 to the GBE 2 Line Cascade ports on the SCE 2000 platform Connect the control cable to the Bypass 2 9 pin D Type connector on the rear panel of the SCE 2000 platform Figure A 4 SCE 2000 Rear Panel Bypass Connectors Step 1 Connect an optical cable user supplied between the GBE port on the Subscriber side network element and the SUB port on the External Optical...

Страница 6: ...External Optical Bypass module be configured to Auto Negotiation OFF Step 6 Connect the control cable supplied in the kit from the Bypass 9 pin D Type connector on the rear panel of the SCE 2000 platform to the Control connector on the External Optical Bypass module The SCE 2000 platform immediately starts providing power to the External Optical Bypass module so the bypass module becomes inactive ...

Страница 7: ...le A 1 Specifications Item Value Optical Connectors SC Switching Speed 15 ms max Operating Wavelength Multi Mode 850 nm Single Mode 1310 nm Operating Temperature 10 C to 65 C 14 F to 149 F Storage Temperature 30 C to 70 C 22 F to 158 F Weight 12 oz 340 g Table A 2 Control Cable Pinouts Function Pin D type side Pin RJ 45 side Bypass Present common to 2 1 1 Bypass Present common to 1 2 2 GND 3 3 GND...

Страница 8: ...A 8 Cisco SCE 2000 4xGBE Installation and Configuration Guide OL 21096 02 Appendix A The External Optical Bypass Module Specifications ...