background image

5

Spacing

The maximum spacing between the axes of ad-

jacent beam detectors is typically 15m for satis-

factory detection under fl at ceilings, providing 

a maximum total area coverage of 1500 square 

metres (15m x 100m).

The minimum spacing between the axes of ad-

jacent detectors is expressed by the following 

equation:

S

 

 L x 0.0875

 

where S is the spacing and L is the distance 

between the detector and the refl ector.

The following table is based on this equation.

SYSTEM DESIGN

 Positioning refl ective beam detectors

The intelligent refl ective beam detector must be 

positioned correctly to minimise the detection 

time.  The detection time depends on

—the location of the beam detector within the 

protected area

—the volume of smoke produced

—the con struc tion of the roof

—the  ventilation arrangements

When deciding where to install the beam detec-

tor and the refl ector, you need to think of the 

construction of the surface you are fi tting it to and 

to possible changes as a result, for example, of 

changing  seasons.  These surfaces must be solid 

and should not be subject to movement.

Particular areas where beam detectors should 

not be fi tted include:

•  spaces where the detector is subject to 

very high levels of ambient light in normal 

conditions

•  areas where excessive amounts of dust, 

smoke or water vapour are present as part 

of the normal environment

•  areas where temperature changes rap-

idly

•  surfaces  subject to vibration or  movement, 

such as cladding or purlins 

•  buildings in which it is not possible to mount 

the beam detector rigidly or align it cor-

rectly

Ensure that spacing complies with the locally 

applicable code or standard.

Distance (m)

Minimum spacing 

between devices (m)

5

0.44

10

0.87

15

1.31

20

1.75

25

2.19

30

2.62

35

3.06

40

3.50

45

3.94

50

4.37

55

4.81

60

5.25

65

5.69

70

6.12

75

6.56

80

7.00

85

7.44

90

7.87

95

8.31

100

8.75

Table 1 Minimum spacing between detectors

Содержание 55000-268

Страница 1: ...EAM DETECTOR INSTALLATION GUIDE Apollo Fire Detectors 36 Brookside Road Havant Hampshire PO9 1JR England www apollo fire co uk PP2146 2003 Issue 1 FIRE DETECTORS LIMITED Part no 55000 268 5 50 metres...

Страница 2: ...General 7 Setting the obscuration level 7 Setting the address 9 Fitting the reflective beam detector 10 TARGETING ALIGNING AND COMMISSIONING THE REFLECTIVE BEAM DETECTOR What is targeting and aligning...

Страница 3: ...e advice in this guide you will avoid problems and repeated site vists Read the guide through once in order to understand the steps needed to install and align correctly Keep the guide handy to refer...

Страница 4: ...registered by the receiver is reduced by an amount dependent on the density of the smoke In the event of the smoke obscuring the light by a pre selected minimum level for a period of 8 to 10 seconds a...

Страница 5: ...c tor and the reflector you need to think of the construction of the surface you are fitting it to and to possible changes as a result for example of changing seasons These surfaces must be solid and...

Страница 6: ...ith pitched roofs or ceilings the maximum distance either side of the beam in the apex only may be increased by 1 for each degree of ceiling pitch up to a maximum of 25 Fig 2 Example Roof pitch 20 Spa...

Страница 7: ...la tion program known as Loop Calculator has been developed by Apollo for use by system designers and is avail able as a free down load from the Apollo website www apollo fire co uk INSTALLING BEAM DE...

Страница 8: ...3 6 5 X 64 8 7 2 1 ON 4 3 ADDRESS REFER TO APOLLO PUBLICATIONPP2146 32 L2 OUT LOOP CONNECTOR DIAGNOSTICS L1 IN L2 IN 2 L1 OUT 1 8 4 16 2 1 ON 4 3 6 5 X 64 8 7 Part No 55000 XXXAPO Intelligent DO NOT...

Страница 9: ...1 Address 90 Example 0 1 1 2 4 8 16 32 64 Address 1 not used 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 91 41 42 43 44 45 46 47 48 49...

Страница 10: ...ng objects i e doors mechanical lifting equipment etc will interfere with the beam path Using the template provided mark the 4 fixing points on the structure and drill holes The rear mounting plate of...

Страница 11: ...aligning process the reflective beam detector is panned moved on its vertical axis and tilted moved on its hori zontal axis Two thumbwheels are provided to carry out these actions Fig 8 Successful tar...

Страница 12: ...D illuminated if beam hits outer part of the reflector or no part of the reflector red LED flashes if the centre of the beam falls in the area shown as a light ring in Fig 10b The nearer the centre th...

Страница 13: ...e thumbwheel and start counting the number of steps 5 Stop turning the thumbwheel when the amber LED goes out and the red LED starts flashing 6 Turn the thumbwheel back half the number of steps counte...

Страница 14: ...sition alignment The detector will automatically optimise the infra red beam strength and receiver sensitivity Progress of optimisation is indi cated by the LEDs on the front of the detector Flashing...

Страница 15: ...e amber LED flashes then stop turning Fig 18 Go to step 5 5 Turn the thumbwheel back counting the number of turns as you go until the amber LED starts flashing again and stop Fig 19 If the red LED fla...

Страница 16: ...When the detector has been switched to Operating Mode it performs an internal cali bration check The amber LED may flash for up to 60 seconds When it goes out perform the reflector test If the detecto...

Страница 17: ...argeting mode 3 Alignment mode 4 General fault warning 5 Signal High fault 6 Contamination compensation limit reached 20 Alignment drift negative 25 Detector normal 30 Alignment drift positive 32 Cont...

Страница 18: ...ected obscuration threshold taking care not to cover the the trans mitter optics lower lens The beam should change to the alarm condi tion within 10 seconds and the red LED should illuminate Check tha...

Страница 19: ...control panel If a value less than 54 is transmitted the self test has failed and the beam detector should be inspected see Troubleshooting on page 20 Output bit 0 is not used Input bits 2 1 and 0 re...

Страница 20: ...evice not recognised Type code incompatibility Contact control panel manufacturer to check compatibility Unable to obtain amber flashing alignment LED No power to detector Check wiring Unable to obtai...

Страница 21: ...00 273 50 to 100 metres detector to reflector Supply Voltage 17 28V DC plus protocol Supply Current Prism targeting mode 17mA Alignment mode 17mA Run mode quiescent 5mA Alarm LED illuminated 9mA Fault...

Страница 22: ...RE DETECTORS LIMITED Apollo Fire Detectors Limited 36 Brookside Road Havant Hants PO9 1JR England Tel 44 0 23 9249 2412 Fax 44 0 23 9249 2754 Email techsales apollo fire co uk Website www apollo fire...

Отзывы: