Displays are all examples in this manual, which may have some difference from the real
data in meters.
Since it is life-threatening to touch live components, the power must be cut off before
installation and replacement.
Please obey local safety rules; Installation and replacing of meter only could be done by
qualified person with specified technology.
When installing meter, pay attention to
meter’s safety; Appearance damaged or fell downed
meters are not allowed to install.
Washing the meter by water is not allowed.
The Meter Standard applies to production and test in Meter Electronics, not the standard for
client test or acceptance. Only IEC standards apply to the client inspection and acceptance
.
COPYRIGHT NOTICE
Sustainable product improvement is a policy in AplombTech BD Ltd. Therefore, the company
reserves rights to change product operational details and specification. Contents of this manual
may be changed without special notification. Without permission in writing from AplombTech BD
Ltd., any part of the manual cannot be reproduced or spread in any form or by any means for
any purpose by any individuals or other companies.
Содержание SEM 3P V2
Страница 1: ...APL SEM 3P V2 Three phase Keypad Energy Meter Technical Manual ...
Страница 34: ...29 Smart Meter User Manual ...
Страница 35: ...30 ...