background image

A

B

C

D

ae

3

1

e

e

e

e

2

e

Place the panels on top

of the base making sure

that they are all tight

and flush before fixing

the panels together

using 3 x 50mm screws

for each corner.

Fix the front and back

panels to the floor

screwing down through

the bottom batten from

inside the unit using 3 x

50mm screws for each

panel.

f

f

f

f

f

f

f

f

f

f

5

6

8mm

10

9

16

Place the angled boards against the

front and back panels as shown to

create an apex. Fix each board in

place using 3 x 25mm screws.

fd

fd

fd

16 is for the

Overlap Garden

Store only.

Fix each of the corner strips

along the edges so that they

are flush and fix each in

place using 4 x nails.

f

f

f

f

Board and bearer

must be flush

Floor Assembly

PRE-DRILL

PRE-DRILL

PRE-DRILL

PRE-DRILL

Отзывы: