4. Load Cell Installation
14
PNEG-2340
Feed-Link 2
Raising the Bin
1. Place 4 x 4 spanner board under bin hopper
braces.
2. Center lift jack under 4 x 4 spanner brace.
3. Lift bin with jack about 4". This should lift
two (2) bin legs.
4. Remove the leg anchor base plate.
Figure 4D Jacking Up the Bin
Figure 4E Lift Bin about 4"
Only install load cells on an
empty bin. Lifting a bin with feed
in it can result in damage to the
bin and potential personal injury.