![Aobosi YC-100B Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/aobosi/yc-100b/yc-100b_instruction-manual_2949277005.webp)
5
YC-100B Installation Drawing (mm/inch)
ACCESSORY INSTALLATION BEFORE OPERATING
UNPACKING AND CLEANING THE WINE COOLER
●
Remove the exterior and interior packing materials.
●
Let the appliance stand upright for approximately 24 hours before connecting it to the power
source, which helps to reduce the possibility of a cooling-system malfunction from handling
during transportation.
●
Use a soft cloth to clean the interior surface with lukewarm water.
●
Install the door handle provided with the appliance by following these steps:
1
st
step
-
Remove the gasket
at the inner side of the door
to expose the two screw holes.
2
nd
step
-
Install the handle tightly with the screws
and washers provided.
3
rd
step
-
Tidy and restore the gasket.
G a s k e t
F la t Washer
H a n d le
Locker Washer
S c r e w
Door F r a me
(23inch)
(20.8inch)
(22.8inch)
(14.9inch)
(0.3inch)
(2.9inch)
(0.5 -1.1inch)
(0.1inch)
(29.1inch)
(33.6inch)
(15.1in
ch)
(33.2inch)
(32.7inch)