Anua Purasys sbr Скачать руководство пользователя страница 9

8

Call:

336-547-9338

or visit:

anuainternational.com

R

ef

er

en

ce

 M

an

ua

l

4.3

Reactor Tank

(if applicable, for two tank systems)

Supply and install the reactor tank in accordance with applicable State or Local regulations. The
reactor tank must be watertight against ground or surface water infiltration and/or exfiltration.
Install reactor tank on stable, compacted fill (e.g. stone ≤1” or similar material).
Reactor tank must be backfilled with suitable material as recommended by the manufacturer.
Backfill must be free of debris and large or sharp objects.
Install water tight risers over access ports to provide access for maintenance and sludge removal.
Install aerator stand, siphon/sludge pump stand, clear water discharge pump stand, and
other components per installation checklist. The aerator, siphon/sludge pump, clear water
discharge pump, timer float, and high water alarm float heights are factory set.
Install siphon/sludge return line from the pretreatment tank to the reactor tank in accordance
with applicable State or Local regulations. The siphon/sludge return line must be adequately
supported to prevent damage during backfilling.
Secure the pre-drilled siphon pipe in the pretreatment tank with the top 3/8” hole at the
correct height as indicated in the design.
Connect the clear water pump discharge line to the drainfield in accordance with applicable
State or Local regulations.
Backfill and grade around the reactor tank to prevent infiltration of surface water.

4.4

Site Restoration

The riser lids must be installed above grade with the ground landscaped to divert storm water
away from the area.
Backfill should be suitable, loose, workable material.  
Backfill must be free of debris and large or sharp objects.
Compact backfill sufficiently to adequately prevent settlement.
Landscape (e.g. grass seed, sod, straw, landscape stone, xeriscape, etc.) the sloped backfill area
and any trench excavation 
lines with a suitable indigenous seed variety or use other methods.
PROVIDE EROSION PROTECTION AS REQUIRED PER DESIGN PLAN.

Installation Warning

If you are not using an air break on 

the clear water pump discharge pipe, 

then install a check valve!

Construction Warning

During construction, harmful 

chemicals such as paint and 

solvents can harm the system 

microbes if dumped down the 

drain. These items should not be 
allowed into the treatment plant.

Anua_PuraSys_RefManual_063016_Anua_PuraSys_RefManual  6/29/16  4:41 PM  Page 9

Содержание Purasys sbr

Страница 1: ...Reference Manual Only models bearing the NSF logo and designated PS1 XX are certified to NSF ANSI Standards 40 and 245 Call 336 547 9338 or visit anuainternational com 2016 Anua 6 2016 ...

Страница 2: ...Restoration 8 5 0 System Wiring 9 5 1 Power Supply 9 6 0 Reactor Venting and Plumbing 9 6 1 Reactor Venting 9 6 2 Reactor Plumbing 10 7 0 System Startup 10 8 0 Smart Control Panel Overview 10 9 0 Maintenance 11 9 1 Clarity Test 11 9 2 Sludge Biomass 11 10 0 Troubleshooting 12 11 0 Owner Use 13 12 0 Owner s Duties 13 13 0 Owner Checklist 14 14 0 Warranty for PuraSys SBR 14 If you require further in...

Страница 3: ...w for stand mounting clamp Siphon pipe pre drilled with 3 8 holes Stand mounting clamp J hook wire holder Stainless clamp Pump mounting clamp Aerator mounting clamp Air vent Sonic dampener 4 aerator Vibration dampener 1 x 1 5 aerator 1 Anua 1 Autodialer 1 Anua w 2 float grips 2 pump grips 1 aerator grip 1 Goulds STS31 1 Goulds STS31 see note 3 2 Alderon included with panel 1 Anua A STAND PS 2 Anua...

Страница 4: ...umped from the Reactor to the discharge point 5 Sludge Return Excess sludge is returned from the Reactor to the pretreatment to maintain a proper sludge age 3 0 System Design 3 1 Pretreatment or Septic Tank The pretreatment tank riser s and lid s must be watertight The minimum volume shall be 250 gallons per bedroom Alternatively the size and configuration shall be in accordance with State or Loca...

Страница 5: ..._______________________________________________________________________________________________________________ PS1 11 1 100 1 664 1 497 1 830 _________________________________________________________________________________________________________________________ PS1 12 1 200 1 815 1 634 1 997 ________________________________________________________________________________________________________...

Страница 6: ...otal emergency storage volume is calculated based on the available volume in the pretreatment tank and the reactor chamber tank above the normal operating levels to the inside tank lid Since the chambers are con nected via the air space above the baffle wall volume in both chambers can be counted for emergency storage In some jurisdictions the riser volume can be counted for emergency storage Emer...

Страница 7: ...ons An alarm will trigger under the following conditions High water float activated in reactor chamber Aerator current 1 or no current Siphon sludge pump current 1 or no current The operational sequence is outlined below If the clear water discharge pump fails or malfunctions a high water condition will occur in the reactor chamber The high water condition will trigger the an alarm The high water ...

Страница 8: ...Installation Warning Do not backwash a water softener into the system Table 2 PuraSys SBR Pretreatment Tank Siphon Pipe Dimension from Tank Bottom and Pump Out Requirements _____________________________________________________________________ _____________________________________________________________________ 36 14 9 _______________________________________________________________________________...

Страница 9: ...st be adequately supported to prevent damage during backfilling Secure the pre drilled siphon pipe in the pretreatment tank with the top 3 8 hole at the correct height as indicated in the design Connect the clear water pump discharge line to the drainfield in accordance with applicable State or Local regulations Backfill and grade around the reactor tank to prevent infiltration of surface water 4 ...

Страница 10: ...ds as follows 20A 2 Pole 240V breaker 20A 1 Pole 120V breaker 6 0 Reactor Venting and Plumbing 6 1 Reactor Venting Aerator must be supplied with fresh oxygen Direct aerator air tube into vent housing and cut to proper length to insure hose will rest inside of vent housing without impeding air flow to aerator Air vent included in the kit is not required for use However air tube must exit to atmosph...

Страница 11: ...r any plumbing leaks When start up is completed the system can be left on The system will remain in vacation mode until water begins to flow from the facility 8 0 Smart Control Panel Overview The smart control panel is designed be simple and easy to operate All key adjustments and readings can be accessed through the four button keypad Operational data is stored in the PLC The smart control panel ...

Страница 12: ...eight inch disk with alternating black and white colored quadrants just above the sludge blanket in the reactor chamber Be careful not to disturb the sludge blanket If the disk is visible when the reactor chamber is 1 3 full then the effluent quality passes the clarity test 9 2 Sludge Biomass A mature system should have a healthy one foot layer of sludge at the bottom of the reactor chamber This o...

Страница 13: ...s or insects Check for signs of damage by any type of motor vehicle Check for signs of damage by any plant or tree root intrusion Infiltration or Exfiltration Identify leak using chalk camera or smoke Repair leak and test Electrical controls Test power supply for volts Test pumps and aerator for volts and amperage draw Replace controls or other electrical components that are malfunctioning or non ...

Страница 14: ...eck if the electrical circuit breakers tripped off by first turning them off and then turning them back on again Call your Authorized Service Provider with issues or questions DON T Flush foreign objects these can damage pumps and cause blockages Flush wipes these do not degrade like paper and can cause problems with treatment Pour grease down the drain these harm microbes in the system and can ca...

Страница 15: ...f the system and answered my questions satisfactorily The service provider has shown me the list of items that shall not be allowed into the system I am aware that only the service provider may maintain or repair the system including scheduling pumpouts or else my warranty can be voided I am aware that I am to report any alarm bad odor or strange noise to the service provider immediately I am awar...

Страница 16: ...rried out by any independent contract or any failure due to accidental or malicious damage or failure to comply with recommendations for operations and maintenance or unit abuse fair wear and tear frost storm damage infiltration of storm or surface water or any other such climatic conditions or acts of God generally In particular note that this warranty will not operate unless the customer can pro...

Отзывы: