
9
P/N 1010807 Rev. Q 09/18
®
Replacing Conveyor belt Chains
1.
Turn the power off, unplug the power
cord, and allow the unit to cool before
proceeding.
2.
Remove the Butter Wheel, Pan, and
Heat Shield and set the Compression
Control Knobs to 6 & 6 or 6 & F.
3.
Open both Conveyor Covers and pull
the Belt Wrap Pin out of the zipper.
4.
Remove & discard old Belt Wrap(s).
5.
Disconnect the Conveyor Belt Chain
by squeezing any two links together
and unhooking both ends of one link
(Figure 10).
6.
Place the replacement Conveyor Belt
Chain on the top sprockets with hook
ends down.
NOTICE:
The ends of the hooks must
point down (Figure 10).
7.
Wrap the Conveyor Belt Chain around
the top and lower sprockets and con-
nect by hooking both ends together.
NOTICE:
Make sure the Conveyor Belt
Chain is installed under the Up-
per Support Rod and over the
Lower Support Rod.
Checking the Roller Tensioners
Measuring The Roller Tensioners
1.
Measure the Roller Tensioner on both
inner Conveyor Covers (Figure 11)
using a U.S Nickel.
2.
The space between the inner Convey-
or Cover and bottom of the Tensioner
wheel should be 13/16” (2.1 cm) or the
height of a U.S. Nickel.
3.
Adjust or replace any damaged ones
as recommended.
Replacing Roller Tensioners
1.
Push down on retaining tab of the
tensioner.
2.
While keeping pressure on the retain-
ing tab, slide the tensioner out of the
retainer plate.
3.
Replace the tensioner by sliding the
new one into the retainer plate.
Figure 9.
Removing Conveyor Belt Chain
Rotation
Upper Support Rod
Large Link
P/N 0800121
Small Link
P/N 0800204
Figure 10.
Removing Conveyor Belt Chain
Figure 11.
Measuring Roller Tensioner
Retainer Plate
Tensioner Assy.
Retainer Tab
Figure 12.
Replacing Roller Tensioner Assy.
Содержание VCT-1000 Series
Страница 12: ...12 P N 1010807 Rev Q 09 18 Wiring Diagram ...
Страница 20: ...20 P N 1010807 Rev Q 09 18 Notes ...
Страница 21: ...21 P N 1010807 Rev Q 09 18 Notes ...