Fig.5
Unvented Systems Kit,
Correct Sequence
INSTALLATION
SECTION 3
WATER
CONNECTIONS
12
F 3
Expansion Vessel
F 4
Temperature/
Pressure Relief
Valve
Cold Water Inlet
to Water Heater
F 2
Check Valve/
Expansion
Valve
F 6
Tundish
F 1
Pressure
Reducing
Valve/
Strainer
Cold Water Feed
Balanced Cold
Water Take-off
(if required)
NB. Tees, elbows, stop valve and pipework not supplied.
F 7
Hose Assembly
F 8
Wall Bracket Assembly
F 5
Reducing Bush
Содержание RSC 150
Страница 2: ......
Страница 4: ......
Страница 25: ...NOTES 21...
Страница 26: ...NOTES 22...
Страница 27: ......