GENERAL AND SAFETY INFORMATION
SECTION 1
The Andrews Water Heater has been designed for use with PROPANE or BUTANE GAS
only and is manufactured to give an efficient, reliable and long service life.
To ensure the continued, trouble-free operation of your heater at maximum efficiency, it
is essential that correct installation, commissioning, operation and service procedures are
carried out strictly in accordance with the instructions given in this manual. By law,
installation and commissioning of the heater must be carried out by properly qualified
personnel.
The heater(s) must be installed in accordance with the following requirements;
The current GAS SAFETY (INSTALLATION AND USE) REGULATIONS
The current BUILDING REGULATIONS
The Water Supply (WATER FITTINGS) REGULATIONS 1999
Additionally, installation should be performed in accordance with all relevant
requirements of the Gas Supplier, Local Authority and recommendations of the British
Standards and Codes of Practice detailed below.
STANDARD RANGE
BS 6700: 1997
Specification for design, installation, testing and maintenance of
services supplying water for domestic use within buildings and their
curtilages. This standard supersedes the following British Standards
and Codes of Practice: CP99, CP310, CP324, 202, CP342 Part 2,
Centralised Hot Water Supply.
BS 5440
Installation of flues and ventilation for gas appliances of rated output
not exceeding 60kW.
Part 1:2000
Specification for installation of flues.
Part 2:1989
Specification for installation of ventilation for gas appliances.
BS 5546:1990
Installation of gas hot water supplies for domestic purposes.
BS 6891
Installation of low pressure gas pipework of up to 28mm in domestic
premises.
BS 7206:1990
Specification for unvented hot water storage units and packages.
I/M2
Purging procedures for non-domestic gas installations.
I/M5
Soundness testing procedures for industrial and commercial gas
installations.
I/M11
Flues for commercial and industrial gas fired boilers and air heaters.
I/M16
Notes on installation of gas pipework
(excluding 25mm and below).
Hi-Flo RANGE
As STANDARD RANGE plus:
BS 6644:
Installation of gas fired hot water boilers of rated inputs between
60kW and 2MW.
IGE/UP/10 Pt.1
Edition 2
Installation of Gas Appliances in Industrial and Commercial Premises
NOTE:
Consideration should be given to amendments or updates to the
above standards.
GENERAL
INFORMATION
BRITISH
STANDARDS
AND CODES OF
PRACTICE
2
Содержание L24/31
Страница 3: ......
Страница 5: ......
Страница 14: ...INSTALLATION SECTION 3 9 Bulk Storage Vessel Installation Cylinder Installation Fig 3 ...
Страница 22: ...INSTALLATION SECTION 3 17 Fig 8 Fig 8a ...
Страница 24: ...INSTALLATION SECTION 3 WATER CONNECTIONS 19 Fig 10 Fig 11 ...
Страница 27: ...INSTALLATION SECTION 3 WATER CONNECTIONS 22 Fig 14 Fig 15 ...
Страница 30: ...INSTALLATION SECTION 3 WATER CONNECTIONS 25 Fig 18 Fig 19 ...
Страница 51: ...PARTS LIST AND ILLUSTRATIONS SECTION 9 46 Hi Flo Model L32 143 Hi Flo Models L65 169 L81 251 ...
Страница 53: ...PARTS LIST AND ILLUSTRATIONS SECTION 9 48 Hi Flo Models L62 309 L54 399 ...
Страница 58: ...NOTES 53 ...
Страница 59: ...NOTES 54 ...
Страница 60: ......