![Andrew ES76PK-1 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/andrew/es76pk-1/es76pk-1_installation-operation-and-maintenance-manual_2942544051.webp)
53
Preventive Maintenance
Lube Components
Frequency
Type
Type
No. of Lube
Point to be
(Months)
of
of
Points or
No.
Lubricated
1
3
6
12
Service
Lube
Quantity
1.
Azimuth/Elevation Jackscrew Housing
X
Pressure Fitting
SHC32
1
2.
1
Azimuth/Elevation Jackscrew Gear
I*
C**
Pipe Plugs
SHC624
10 Oz
Housing Fill and Drain
3.
Polarization Drive Gear
X
Brush
SHC32
Minimum Surface
Coverage
4.
Feed Rotation Worm Gear
X
Pressure Fitting
SHC32
2
Pillow Blocks
5.
Elevation Axis Pivot Points
X
Pressure Fitting
SHC32
2
6.
Azimuth Turntable Bearing
X
Pressure Fitting
SHC32
2
X = Lubricate
I = Inspect
C = Change
* Inspection requires checking for visible signs of oil leakage, draining replacing and adding oil to ensure appropriate oil
level requirements. Excessively dirty oil will require fresh oil replacement. If oil leakage is found to be excessive, refer to
appropriate troubleshooting information and perform applicable corrective action. Periodic inspection procedures can be
less frequent after first or second scheduled inspections.
** Initial oil change requirements include flushing gear boxes with a standard cleaning agent.
Lubrication Chart