background image

NOTE:

All installations to conform to latest issue of

National Electrical Code.

Ground antenna mount assembly and feed cables in
accordance with current National Electrical Code and
local electrical codes. Figure 2.0 and 2.1 illustrates 
typical grounding methods for the ground pole and 
feed cables.

Clamps that provide a solid connection between ground
wire and ground source should be used.

Tighten and torque all hardware.

IMPORTANT:

Sealing RF Coaxial Connector: The 

copper-plated center conductor in the RF coaxial cable,
which connects receiver to LNB, can experience 
electrolysis corrosion at the LNB connector. Moisture
and DC current causes this type of corrosion. To prevent
corrosion, apply a moderate coat of silicon grease to the
center conductor and wrap the entire connection with

COAX-SEAL

®

tape to seal.

ASSEMBLY AND INSTALLATION

1.2m System (Ref. Fig. 1.6)

Attach Side Feed Legs and Braces to left and right
sides of Reflector using M6 x 20mm Hex Bolts, Lock
Washers and Hex Nuts. (NOTE: Long formed end of
Feed Leg attaches to Reflector. Short formed end of
Brace attaches to inside of Reflector rim.) Attach flat-
ten end of Brace to Extension Plate, using M6 x
22mm Round Head, Square Neck Bolts, Tooth Lock
Washers, Flat Washers and Hex Nuts. Round Head
Square Bolt Fits on the top of Extension Plate. Tooth
Lock Washer fits between the flatten end of Brace
and Extension Plate, then Flat Washer and Hex Nut.
Attach Side Feed Legs to Support Block using M6 x
20mm Hex Nuts and Lock Washers. Leave all hard-
ware loose.

Tighten and torque hardware securing Braces, Side
Legs, and “U” Clip to Reflector and Support Block to 4 ft-
lbs (5.4 N-m). Tighten and torque M6 x 55mm “U” Bolt to
18-22 in-lbs (2-2.5 N-m).

TOOTH WASHER

BLOCK

"U" CLIP

BRACE

SIDE FEED

LEGS

(2 REQ)

RD HD SQ

NK BOLT &

ELASTIC LOCK

NUT

BOTTOM FEED

SUPPORT TUBE

HEX BOLT

LOCK WAHER

(2 REQ)

RD HD SQ

NK BOLT

FLAT WASHER

LOCK WASHER

HEX NUT

RD HD SQ NK BOLT

TOOTH WASHER

FLAT WASHER

HEX NUT

(2 REQ)

M6 x 20mm

HEX BOLTS

LOCK WASHERS

HEX NUTS

(2 REQ-BOTH SIDES)

HEX BOLT

FLAT WASHER

(2 REQ)

FIG. 1.6 - Installation of Feed/Feed Support Legs

to Antenna (1.2m Medium Duty)

NOTE: ALL INSTALLATION TO CONFORM

TO THE LATEST ISSUE OF THE

NATIONAL ELECTRIC CODE.

IMPORTANT

DRILL HOLE AND ATTACH

GROUND BEFORE POURING

CONCRETE INSIDE GROUND POLE.

GROUND POLE

GROUND LUG

25"-29"

APPROX.

GROUND WIRE

(TYPICAL #10 AWG COPPER, #8 ALUMINUM)

REFER TO NEC SECTION 810 AND LOCAL ELECTRIC

CODES FOR THE SPECIFIC AREA REQUIREMENTS.

APPLY SEALANT HERE, AFTER ASSEMBLY,

TO IMPROVE CORROSION RESISTANCE

DRILL HOLE THRU ONE WALL WITH

7/32" DIA. TWIST DRILL

1/4" EXTENSION TOOTH LOCK WASHER

1/4"-20 UNC x 5/8" HEX HEAD,

TYPE "D" POINT, SELF TAPPING SCREW

FIG. 2.0 - Typical Electrical Grounding for

Antenna Ground Pole

GROUNDING

*GROUND BLOCK

NEC SECTION 810-20

*GROUNDWIRE

NEC SECTION 810-20

*ITEMS NOT

INCLUDED

*COAXIAL CABLE

TO RECEIVER

*COAXIAL CABLE

FROM LNB

FIG. 2.1 - Grounding Feed Cables

7

90

80

70

60

50

40

30

20

10

0

10

20

30

40

50

60

70

80

0

EARTH STATION LATITUDE IN DEGREES NORTH OR SOUTH OF EQUATOR

E

L

E

V

A

T

IO

N

IN

D

E

G

R

E

E

S

"

L" IS THE DIFFERENCE BETWEEN THE EARTH STATION

ANTENNA SITE LONGITUDE AND THE SATELLITE LONGITUDE

ELEVATION CHART

  CHART 2  

5

O

10

O

15

O

20

O

25

O

30

O

35

O

40

O

45

O

50

O

55

O

60

O

65

O

70

O

75

O

50

O

125

O

120

O

115

O

110

O

105

O

100

O

95

O

90

O

85

O

80

O

75

O

70

O

65

O

50

O

47.5

O

45

O

42.5

O

40

O

37.5

O

35

O

32.5

O

30

O

27.5

O

25

O

47.5

O

45

O

42.5

O

40

O

37.5

O

35

O

32.5

O

30

O

27.5

O

25

O

10

Содержание 123 Class I

Страница 1: ...SA Customer Support Center From North America Telephone 1 800 255 1479 Fax 1 800 349 5444 satcom andrew com One Company A World of Solutions International Telephone 1 708 873 2307 Fax 1 708 349 5444 I...

Страница 2: ...iately upon failure Non compliance with any part of this claim procedure may invalidate this warranty in whole or in part THIS WARRANTY IS EXPRESSLY IN LIEU OF ALL OTHER AGREEMENTS AND WARRANTIES ANY...

Страница 3: ...required before installing an antenna It is the property owner s responsibility to obtain any and all permits Before any digging is done information regarding the possi bility of underground telephone...

Страница 4: ...foot c Lateral soil pressure of 400 pounds per square foot d Concrete compressive strength of 2500 pounds per square inch in 28 days 2 CAUTION The foundation design shown does not represent an approp...

Страница 5: ...protection 1 Pole and foundation design based on the following criteria a Uniform building code exposure B or C and 1 5 stability factor b Vertical soil pressure of 2000 pounds per square foot c Late...

Страница 6: ...lector and insert exposed portion of bolt to holes in Antenna Bracket Flange Install 4 Lock Washers and Hex Nuts on bolts Ref Fig 1 2 Assemble Extension Plate to AZ EL Housing using two M6 x 22mm Roun...

Страница 7: ...nd Hex Nuts Round Head Square Bolt fits on the underside of Mount Housing top flatten end of Brace on top side of Mount Housing Tooth Lock Washer on top of flatten end of Brace then Flat Washer and He...

Страница 8: ...or and Support Block to 4 ft lbs 5 4 N m Tighten and torque M6 x 55mm U Bolt to 18 22 in lbs 2 2 5 N m TOOTH WASHER BLOCK U CLIP BRACE SIDE FEED LEGS 2 REQ RD HD SQ NK BOLT ELASTIC LOCK NUT BOTTOM FEE...

Страница 9: ...ion and counterclockwise to increase elevation Align the edge of the Clamp with appropriate mark on housing at the desired elevation reading This will be an approximate setting Optimum setting achieve...

Отзывы: