Andisoon Measure LFP80-50 Скачать руководство пользователя страница 19

User Manual

16

If found the pump water during operation, the user must stop immediately, and lifting
the LFP80-50 model pump tank. When the pump and pump tank completely heat,
firstly clean pump tank water, and then flat pump, the pump purge for about 10 hours
by hot air, blow out the evaporation of water in the pump body. In the blowing
process, the pump needs to be heated to 40

, and change the direction of pump

and hot air entrance, every 2 or 3 hours.

APPENDIX

: INSTRUCTIONS FOR USE

ACCESSORIES

1.

Accessories list

No.

Name

Material

Specification

Amount

1

Copper tube

T2

φ8×φ6×15mm

9

2

Shrinkable tube

Polyolefin

Hφ10/5

1000mm

3

Steel wire

304

φ1

800mm

2.

The Location Copper tube used

Copper wire joint.

Method of use:

After copper wire into tube, use fast hydraulic pliers to press those tight.

Refer to the picture 1 below.

3. The Location Shrinkable tube used

Set out in the pressed copper wire exposed.

Method of use: Set a certain length of shrinkable tube out in the pressed copper wire where is
exposed. Use heat blower to heat the shrinkable tube until it shrink uniformity. Once again set
shrinkable tube out in the tube which has been shrinking, and use heat blower to heat the
shrinkable tube until it shrink.

NOTICE!

No damage in the shrinkable tube.

4. The method of use for Steel wire

Содержание LFP80-50

Страница 1: ...User manual Cryogenic Submerged Centrifugal Pump Model LFP80 50 Chengdu Andisoon Measure Co Ltd...

Страница 2: ...4 1 PRODUCT PROFILE 4 2 TECHNICAL PARAMETERS 5 3 STORAGE BEFORE INSTALLATION 5 PUMP INSTALLATION 6 1 SECURITY ALERTS AND PREVENTIVE MEASURES 6 2 INSTALLATION OF THE PUMP 6 3 INSTALLATION AND LIFTING 7...

Страница 3: ...ULT AND TROUBLESHOOTING 11 2 INSPECTION AND MAINTENANCE 13 FAST OPERATION GUIDE 13 1 INSTALLATION STEPS 13 2 IMPORTANT OPERATION STEPS 15 APPENDIX INSTRUCTIONS FOR USE ACCESSORIES 16 APPENDIX PERFORMA...

Страница 4: ...safely is to learn about its feature and use conventional test program on the basis of these knowledge Because of the extreme low temperature environment and all the liquefied gas into a gas at a hig...

Страница 5: ...ion traction on the other side never allow enter container or building which may have cryogenic gas Because exist a serious security hidden danger when companion entry into a closed environment to sav...

Страница 6: ...ould apply to explosive gas atmospheres 5 All of the safety accessories should be correctly installed connected and set with signal value 9 USER RESPONSIBILITY Installation operation and maintenance o...

Страница 7: ...installation and operation of such areas to achieve requirements for cryogenic liquid pumped LFP80 50 model is a vertical grade 2 direct coupling pump which is directly mounted on a drive motor All o...

Страница 8: ...ction after receipt Once receipt inspect the product immediately and report the damage resulted in the transport to the transport company or we company 3 Storage of the pump If the pump will not come...

Страница 9: ...accidents 3 When lifting pump assembly motor and pump at any time adopt appropriate methods and lifting points 4 Install components correctly 5 Ensure components do not fall out or collapse after sub...

Страница 10: ...nnecting three conductors which connected well Refer to Appendix Instructions for use accessories 2 After pump body installed in the vacuum pump tank connect the tube of frequency converter and three...

Страница 11: ...main pipeline 5 Add a draft tube to the liquid discharge port vent valve and safety valve discharge to lead liquid or gas to the security discharge position draft tube s diameter should not be less th...

Страница 12: ...ower supply 3 Insure the accept system ready to receive the liquid pumped 4 Check all of the pipelines connectors and fixing bolts are ready 5 Insure that pump and pump tank already handled with inert...

Страница 13: ...n outlet discharge liquid valve 3 For insure system security check the pressure of storage tank Can reduce the pressure by open the vent valve located at top of storage tank WARNING Don t try to contr...

Страница 14: ...and to abide by the following points 1 Don t remove the lid of the pipeline and interface until they are directly connected 2 Use a new gasket 3 Don t tighten the fasteners on the foundation until th...

Страница 15: ...Pump body vibration Insufficient Pump body vibration gas corrosion allowance To improve the cavitation allowance The liquid vaporization serious Improve the cavitation allowance Bearing wear Replace...

Страница 16: ...wear or damage inside junction box Check if the liquid flow freely ensure the cooling liquid flow smoothly A year Disassembling the pump body and check the wear of all parts check every 4000 hours at...

Страница 17: ...hreaded holes on pump tank cover are aligned with each other Put the spring energy storage ring fastening pump to the cover of pump tank through bolts and nuts using a wrench 4 3 wire of motor corresp...

Страница 18: ...startup conditions have completely start the pump at the rated speed 65 If there is abnormal sound should stop immediately and check If the pressure raise up after starting pump adjusting the outlet...

Страница 19: ...on Amount 1 Copper tube T2 8 6 15mm 9 2 Shrinkable tube Polyolefin H 10 5 1000mm 3 Steel wire 304 1 800mm 2 The Location Copper tube used Copper wire joint Method of use After copper wire into tube us...

Страница 20: ...User Manual 17 Twist the steel wire around the screws which connect the motor cover of submerged pump and the flange of pool pump to prevent loosing Refer to the picture 2 below Picture 1 Picture 2...

Страница 21: ...User Manual 18 APPENDIX PERFORMANCE PARAMETERS...

Страница 22: ...User Manual 19...

Страница 23: ...User Manual 20 APPENDIX PUMP OVERALL AND INSTALL DIMENSIONS Units mm...

Страница 24: ...User Manual 21 APPENDIX PROFILE DIAGRAM OF PUMP WITH PUMP TANK NOTE All dimensions are given in millimetre...

Страница 25: ...4 12 Gasket 2 13 Stator 1 14 Rotor 1 15 Spring energy storage washer 40 30 3 8 16 Deep groove ball bearings 6307 1 17 Motor upper cover 1 18 Spring energy storage washer 65 57 3 1 19 Hexagon socket he...

Страница 26: ...User Manual 23 2 Drawing General assembly drawing...

Страница 27: ...24 3 Explosive view...

Страница 28: ...s subject to change without prior notice Chengdu Andisoon Measure Co Ltd Address No 88 Wulian Road West Gongxing Subdistrict Shuangliu District Chengdu Sichuan China Tel 028 63165820 Fax 028 63165817...

Отзывы: