— 8 —
STEP 1
Read the Safety Instructions
•
It is very important to read the safety instructions on pages 4 and 5.
IMPORTANT: It is the installer’s responsibility to comply with installation clearances.
STEP 2
Unpack Range Hood and Prepare Tools
•
Carefully unpack the range hood and parts. Make sure all parts are included as shown on page 6.
•
DO NOT remove the protective film covering the appliance until the installation is fully completed.
•
Consult a qualified and trained installer or check local codes for makeup air requirement, if any.
STEP 3
Plan Desired Location
•
Plan a desirable location that fits all requirements in the Safety and Installation sections of this manual. Plan where
and how the ductwork will be installed.
•
A straight or short duct run will allow the unit to perform most efficiently. Long duct runs, elbows and transitions
will reduce the performance of the unit. Each elbow is equivalent to 5 to 10 feet (1.5 m to 3 m) of straight run.
•
If ductwork is already installed: ensure ductwork is free from debris.
STEP 4
Test Unit Functions
•
Connect the unit and test all of the functions before installing.
• Place the range hood on a flat, stable surface. Connect the range hood to a designated standard outlet (120-Volt, 60Hz)
and turn on the range hood. Verify all operations of the range hood by referring to
Range Hood Operations.
•
Turn power On in control panel.
•
Check all lights and fan operations.
WARNINGS:
• Please make sure to read ALL safety instructions on pages 4 and 5.
• Use two or more people to move and install range hood.
• Failure to follow these instructions can result in serious injury.
Installation