background image

16

Upright

Rafter/Upright Pin w/Flat.  Place 
inside end of Rafter and down 
thru open hole and upright after 
upright is slid into slide 

fi

 tting.

Ridge Weldment

Wood Blocking
(Typ.)

Rafter

Slide Fitting

Rafter

Figure 2.2a

Figure 2.2b

Locking L-Pin 
16mm w/ Stop (typ.)

Locking L-Pin 
16mm w/ Stop (typ.)

Ridge Brace (only 
when required)

Knee Brace (only 
when required)

Final position

Final position

Содержание Event Series

Страница 1: ...he installation or removal of this product ASEV 12 15 Rev 1 17 Installation Instructions Anchor Structure Event Series EC 5001 7701 Highway 41 N Evansville IN 47725 Phone 812 867 2421 Fax 812 867 1429...

Страница 2: ...14 2 3 Assembly of Cable Bracing 17 3 Erecting the Structure 19 3 1 Preparation for Raising Arches 19 3 2 Raising the End Arch First Arch 19 3 3 Raising the Second Arch 19 3 4 Completing Installation...

Страница 3: ...d on the front or back of this manual Safety Notes Please read through the installation manual completely before beginning your installation Be sure the proper equipment and safety precautions are in...

Страница 4: ...m 1 5 m 18 15 METER Splice size typ Gable end framing Gable end framing Rafter size typ Splice size Rafter size typ 3 0 m 4 8 m 5 m 10 m 5 m 3 0 m 5 1 m 5 05 m 12 m 6 0 m 1 9 m 5 05 m 10 METER EVENT S...

Страница 5: ...5 m 5 05 m 20 METER 25 METER 4 95 m 4 95 m 4 98 m 2 5 m 2 5 m 5 m 2 5 m 20 15 METER 25 20 METER 25 15 METER Gable end framing Gable end framing Splice size Splice size Splice size Rafter size typ Raft...

Страница 6: ...METER 4 0 m 6 1 m 12 m 12 METER 4 0 m 4 0 m 4 0 m 6 6 m 7 4 m 6 6 m 15 m 20 m 18 m 25 m 15 METER 20 METER 18 METER 25 METER Knee Braces required all bays Knee Braces required all bays Knee Braces requ...

Страница 7: ...Upright and Roof Cable Bracing is required in the first and last bays of the structure and additionally at not more than SIX open bays between braced bays 2 All cables are 3 8 Galvanized 7 x 19 aircra...

Страница 8: ...ied supervisor familiar with the proper assembly technique and required safety procedures should be present during the installation Construction Tools Installation and dismantling should be done the c...

Страница 9: ...9 Diagonal Beam Brace 2 R Clip Measuring Rod Push Pole Purlin Forks Mid Panel Guide 2 OPTIONAL...

Страница 10: ...ase plates use 31 1 2 stakes 1 2 1 Starting at point A place the outside corner of 6 Hole base plate 1 at point A making sure the edges along the front and side of the base plate align with the front...

Страница 11: ...11 Figure 1 1a 2 m 2 m A B C T e n t L e n g t h String Line Tent Front Tent Width T e n t L e n g t h A B C D E 5 m A r c 4m Arc 90 Tent Front 3 m Figure 1 1b...

Страница 12: ...Line 90 Figure 1 1c Tent Front 6 hole 6 hole Measuring Rod T e n t S i d e Place corner of Base Plate 1 at Point A and align edges with string lines A Measuring Rod Base Plate L Pin Safety Tab Point A...

Страница 13: ...13 Figure 1 2b Tape measure Measuring point for estimating width 6 hole base plate 6 hole base plate 6 hole base plate Figure 1 2c Rotate Measuring Rod about pin in base plate 4 Tent Front Cabled Bay...

Страница 14: ...re installed IMPORTANT The short leg of the L Pin must be turned down and behind the Safety Tab on the Base Plate to keep the L Pin from sliding out 2 2 2 Connect Rafter to the Upright Assembly by sli...

Страница 15: ...rop in Gable End Uprights Gable End Purlins Locking L Pin 16mm w Stop Locking L Pin 16mm w Stop Intermediate Purlins Ridge Eave Purlin Ridge Eave Purlin Rafter Ridge Weldment Ridge Brace only when req...

Страница 16: ...and upright after upright is slid into slide fitting Ridge Weldment Wood Blocking Typ Rafter Slide Fitting Rafter Figure 2 2a Figure 2 2b Locking L Pin 16mm w Stop typ Locking L Pin 16mm w Stop typ Ri...

Страница 17: ...until the arches are raised 2 3 2 Remove the Eye bolt from the Roof Cable Assembly unhook from shackle at turnbuckle end At End of Rafter on both sides of the cabled bays insert the Eye Bolt into the...

Страница 18: ...before insertion into top hole of Upright Then reattach to cable Eyebolt remove from shackle before inser tion into Rafter Do not reattach to cable until later Figure 2 3c Eyebolts remove from shackl...

Страница 19: ...fted 3 2 2 When the arch is nearly vertical and stable one installer on each side can guide the tube on the pinning end of the Diagonal Beam Brace onto the base plate L Pin of the second arch as shown...

Страница 20: ...Diagonal Beam Brace Push Pole Push Pole Push Pole Diagonal Beam Brace typ Diagonal Beam Brace typ Ridge Weldment Upright Cable Roof Cable Roof Cable R Clip with string attached R Clip with string atta...

Страница 21: ...Pin R Clip First Arch Second Arch Diagonal Beam Brace Install Curved Hook end of Purlin First Angular end last Purlin Fork Purlin Fork Purlin Eave Purlin Eave Purlin Purlins Figure 3 3b Figure 3 3a R...

Страница 22: ...to make frame stable After the Upright Cables have been installed and tensioned remove the Diagonal Beam Braces 3 4 2 The Roof Cables connect to the Eye Nuts at the rafter eaves by using the shackle...

Страница 23: ...tightened to clamp the bracket to the rafter must be facing toward the interior of the tent Make sure the bolts are tight Connect the insert weldment at the top of the G E Upright to the hinge tube at...

Страница 24: ...or Ridge Brace Figure 3 5b Ridge Figure 3 5c Connection for center gable end upright at ridge Connection for Corner Gable Purlin at Side Upright rafter Gable End Base Plate L Pin 5 8 Telescoping end o...

Страница 25: ...he upper ends of the pull loops are even with the edge of the rafter 4 1 4 Flip the tension pocket on top of the mid so it does not get caught on the purlins while pulling the mid through the frame At...

Страница 26: ...nd left versions Mid walls are used at center gable end bays and at all mid bays 4 3 1 Start installing unlaced walls by inserting top of kedar into outside channel opening and slide upper portion of...

Страница 27: ...27 Figure 4 2c Tension Straps Corner Upright Tension Bars in Tension Pockets Figure 4 3a Corner Upright Ground Rail Side 6 hole Baseplate R Clip Ground Rail Gable end Gable Wall Side Wall Figure 4 2b...

Страница 28: ...emoval 5 8 Continue removing purlins and lowering remaining arches until the last bay two arches remains 5 9 Install the Diagonal Beam Braces as noted in Step 3 2 to secure the first arch and allow th...

Страница 29: ...1 3 Inspect all stakes to ensure they are fully engaged 6 1 4 Ensure all FR Warning labels are clearly visible 6 1 5 Do Not allow the accumulation of snow or ice 6 1 6 Check for deformation or damage...

Страница 30: ...20M 5 25M 6 Extrusion Profiles millimeters Uprights Rafters 220 x 100 Gable End Uprights 130 x 70 Ridge Eave G E Purlins 130 x 70 Intermediate Roof Purlins 60 x 60 Rafter Extension Options 15 12 18 15...

Страница 31: ...ation provided in the installation instructions is not a suggestion about what is necessary to meet a site speci c load For additional important information consult The IFAI Procedural Handbook For th...

Отзывы: