General Installation Standards and Guides
General Information
General Installation Process Overview
Process 1-1 provides a general description of the installation process.
Process 1-1
E
QUIPMENT
I
NSTALLATION
P
ROCESS
1
Prepare the site to comply with the Motorola requirements and specifications for
the equipment, as listed in the Motorola R56 manual
Standards and Guidelines
for Communication Sites
. Other codes and guidelines that may apply to the
location must also be met.
2
Inspect and inventory all racks, cabinets, cables, and other equipment with a
Motorola representative to ensure that the order is complete.
3
Install all equipment using the site drawings and other documents provided by the
Field Engineer. Use the installation standards and guidelines for placing and
installing equipment.
4
Properly ground all the racks and cabinets to protect against ground faults,
electrical surges, and lightning.
5
Connect all necessary cables within a rack and between the racks for system
interconnection.
6
Run a preliminary check of a site before applying power.
7
Use Software Download to upgrade the equipment to the latest version of
software.