User Guide
TEST PROCEDURE
Rev. 0 | 5 of 7
The ADRF5301-EVALZ is shipped assembled and tested.
shows a basic setup diagram to measure the scattering parame-
. To complete the test setup and
verify the operation of the ADRF5301-EVALZ, perform the following
steps:
1.
Connect the GND test point to the ground terminal of the two
3.3 V DC power supplies.
2.
Connect the VDD test point to the voltage-output terminal of the
3.3 V DC power supply.
3.
Connect the CTRL test point to the voltage-output terminal
or ground terminal of the other 3.3 V DC power supply. The
can be configured in different modes by connecting
the CTRL test point to 3.3 V or 0 V, as shown in
4.
Connect the RFC, RF1, and RF2 ports to a calibrated network
analyzer.
5.
Turn on the 3.3 V DC power supply connected to the VDD test
point.
6.
Turn on the 3.3 V DC power supply connected to the CTRL test
point.
7.
Measure the scattering parameters.
Figure 4. Scattering Parameter Test Setup Diagram for the ADRF5301-EVALZ
Table 3. Control Voltage Truth Table
Digital Control Input
RF Paths
CTRL
RF1 to RFC
RF2 to RFC
High
Insertion loss (on)
Isolation (off)
Low
Isolation (off)
Insertion loss (on)