background image

ADP5302-EVALZ User Guide 

UG-880 

 

Rev. 0 | Page 3 of 7 

EVALUATION BOARD SOFTWARE QUICK START PROCEDURES 

CONFIGURING THE BOARD 

The 

ADP5302

 evaluation board is fully assembled and tested. 

Before applying power to the evaluation board, follow the setup 

procedures in this section. 

Jumper Settings 

Table 1 describes the jumper settings. Before selecting the 
jumper settings, ensure that the enable input, EN, is high. 

Table 1. Jumper Settings 

Jumper 

State or  

Connection 

Function 

J5 (EN) 

High 

Enable V

OUT

 

Low 

Disable V

OUT

 

J8 (VID) 

VIN 

2.5 V 

GND 

3 V 

Floating 

Program V

OUT

 by an external 

resistor 

J6 (SYNC) 

VIN 

Pulse-width modulation (PWM) 

mode 

GND 

Hysteresis mode 

External 
frequency 

Set the frequency from 
1.2 MHz to 2.5 MHz 

J7 (VIN OK) 

VIN 

Pull VIN OK to VIN 

VOUT 

Pull VIN OK to VOUT 

Input Power Source Connection 

Before connecting the power source to the 

ADP5302

 evaluation 

board, ensure that the board is turned off. If the input power 
source includes a current meter, use the meter to monitor the 
input current as follows: 
1.

 

Connect the positive terminal of the power source to the 
VIN terminal (J1) on the evaluation board. 

2.

 

Connect the negative terminal of the power source to the 
GND terminal (J3) on the board. 

If the power source does not include a current meter, connect a 

current meter in series with the input source voltage as follows: 
1.

 

Connect the positive terminal of the power source to the 
positive terminal (+) of the current meter. 

2.

 

Connect the negative terminal of the power source to the 
GND terminal (J3) on the evaluation board. 

3.

 

Connect the negative terminal (−) of the current meter to 
the VIN terminal (J1) on the evaluation board. 

 
 
 
 
 
 

Output Load Connection 

Before connecting the load to the 

ADP5302

 evaluation board, 

ensure that the board is turned off. If the load includes a current 
meter or if the current is not measured, connect the load 

directly to the evaluation board as follows: 
1.

 

Connect the positive load connection (+) to the VOUT 
terminal (J2). 

2.

 

Connect the negative load connection (−) to the GND 
terminal (J4). 

If a current meter is used, connect it in series with the load as 
follows: 
1.

 

Connect the positive terminal (+) of the current meter to 
the VOUT terminal (J2) on the evaluation board. 

2.

 

Connect the negative terminal (−) of the current meter to 
the positive terminal (+) of the load. 

3.

 

Connect the negative terminal (−) of the load to the GND 
terminal (J4) on the evaluation board. 

Input and Output Voltmeter Connections 

Measure the input and output voltages with voltmeters. Ensure 
that the voltmeters are connected to the appropriate test points 
on the board. If the voltmeters are not connected to the correct 
test points, the measured voltages may be incorrect due to the 
voltage drop across the leads or due to the connections between 

the board, the power source, and/or the load. 
1.

 

Connect the positive terminal (+) of the input voltage 
measuring voltmeter to Test Point TP1 on the evaluation 
board. 

2.

 

Connect the negative terminal (−) of the input voltage 
measuring voltmeter to Test Point TP5 on the board. 

3.

 

Connect the positive terminal (+) of the output voltage 
measuring voltmeter to Test Point TP4 on the board. 

4.

 

Connect the negative terminal (−) of the output voltage 
measuring voltmeter to Test Point TP7 on the board. 

Power On the Evaluation Board  

When the power source and load are connected to the 

ADP5302-EVALZ

 evaluation board, the board can be powered 

on. If the input power source exceeds 2.06 V (typical), the 

output voltage rises to 1.8 V by default. 
 
 
 
 
 
 

Содержание ADP5302-EVALZ

Страница 1: ...ead LFCSP package The ADP5302 runs from input voltages of 2 15 V to 6 50 V and requires minimal external components to provide a high efficiency solution with an integrated power switch synchronous re...

Страница 2: ...aluation Board 1 Revision History 2 Evaluation Board Software Quick Start Procedures 3 Configuring the Board 3 Measuring Evaluation Board Performance 4 Evaluation Board Schematic 5 Evaluation Board La...

Страница 3: ...board Output Load Connection Before connecting the load to the ADP5302 evaluation board ensure that the board is turned off If the load includes a current meter or if the current is not measured conn...

Страница 4: ...of the inductor from the pad on the board and using a wire connected between the pad and the inductor A current probe can then be used to measure the inductor current Measuring Output Voltage Ripple T...

Страница 5: ...1 TP4 VOUT_SNS 1 TP7 GND_SNS 1 VID J8 VID 1 2 3 J3 GND 1 2 C2 C1 NC VOUT J7 VIN_OK 1 2 3 J5 EN 1 2 3 VIN VIN R2 1M R3 0 R1 19 6k U1 ADP5302 EN 1 STOP 2 SYNC MODE 3 VID 4 FB 5 VINOK 6 AGND 7 PGND 8 SW...

Страница 6: ...UG 880 ADP5302 EVALZ User Guide Rev 0 Page 6 of 7 EVALUATION BOARD LAYOUT Figure 4 Top Layer Figure 5 Second Layer 13506 004 13506 005...

Страница 7: ...the Evaluation Board As used herein the term Third Party includes any entity other than ADI Customer their employees affiliates and in house consultants The Evaluation Board is NOT sold to Customer a...

Отзывы: