ADP5090-2-EVALZ User Guide
UG-782
Rev. A | Page 3 of 9
DEMONSTRATION BOARD QUICK START GUIDE
This section explains how to connect the solar panel to the
evaluation board and how to configure the evaluation board to
start up and run.
1.
Connect the 10-pin connector on the solar panel to the J3
10-pin connector on the
as shown in
1283
0-
00
2
Board Hardware
2.
Connect the J2_1 and J2_2, J2_9 and J2_10, and J2_11 and
J2_12 jumper pairs together on the
board, as shown in Figure 3.
3.
Place the system in a bright environment. Monitor the
voltage on the supercapacitor using the TP3 (BATT) and
TP5 (GND) test points (see Figure 3).
4.
The output is available on J4_1 on the
board.
12
83
0-
00
3
Figure 3. Jumper Setup