PREPARING THE LADDER

1.  Remove the ladder from its packaging and place it lid down on a bench or saw stool. 

The lid is less likely to get damaged there than laying it on the ground, as well as 

being better for your back! 

now as it is easier than later, when the unit is in the ceiling.

3.     Turn the lid over so the lid is facing up. Fit the screw eye 100mm in from the opening 

 

INSTALLING THE LADDER

1.  Screw four temporary cleats approx 80mm x 40mm into your timber frame as shown 

 

 

Note: If the ladder is to be installed before the ceiling lining is in place, the cleats 

must be packed down the thickness of the intended ceiling lining. 

2.  Lift the ladder through the opening into the attic space. Then lower down squarely 

into the opening so the lid of the ladder rests on the temporary cleats. This is 

normally best done from below. For safety and ease it is highly recommended that 

two people complete this step. Rotate the cleats off the lid and onto the frame of the 

ladder. 

3. 

further. Adjust if necessary. The ladder must not be allowed to fall, as this could 

cause serious physical injury

4.  Carefully open the ladder, checking that the frame remains securely on the cleats. 

Adjust if necessary. 

5. 

 

6.  Carefully close the ladder and check if square. Wedges or packers may be needed 

at one side of the hinge strip to square the unit in the opening. This may require 

reopening the ladder and loosening or tightening one of the screws a little. 

7.  With the ladder open, pre-drill two 6mm holes in each side of the attic ladder frame 

making sure there is solid timber behind. Screw through the pre-drilled holes into the 

 

8.  Remove temporary cleats. 

9.  Carefully close the ladder and check that the ladder frame is showing around the 

frame and the ceiling frame. Make sure the sides stay plumb and straight. 

10.  Now tighten all screws and check again. 

Содержание A25

Страница 1: ...on with good access at the bottom of the ladder Choose a location that will allow for movement around the ladder when in the down position Allowance must be made for the operation of the ladder as it requires a greater Model Required Opening Landing space Projection A25 1220mm x 650mm 1092mm 1467mm A28 1370mm x 650mm 1201mm 1589mm A31 1440mm x 650mm 1332mm 1801mm The area for the opening must be c...

Страница 2: ... from below For safety and ease it is highly recommended that two people complete this step Rotate the cleats off the lid and onto the frame of the ladder 3 further Adjust if necessary The ladder must not be allowed to fall as this could cause serious physical injury 4 Carefully open the ladder checking that the frame remains securely on the cleats Adjust if necessary 5 6 Carefully close the ladde...

Страница 3: ...45mm or down 45mm Loosen the screws located Move the whole ladder up or down the runners as neccessary to ensure that the hinged When properly adjusted to height tighten the screws in the slots Note On the A31 the adjustment bolts may be hidden behind a spring Fig 10 4 There are 4x6mm holes in the base runners that are clearly marked Bolt Here Using a twist drill drill through the marked holes and...

Страница 4: ...y be void 3 Lubricate all pivot points on your attic ladder at least once a year If your attic ladder is used more than three times a week lubricate every 4 5 months 4 Face the ladder when you are climbing up and down 5 Do not leave young children unattended while ladder is folded down 6 If you have any concerns about your Sellwood attic ladder or it is damaged in any way please call 0800 288 427 ...