background image

Jan 2021 Revision 

AMERICAN SIGNAL COMPANY 

2755 Bankers Industrial Dr. 
Atlanta, GA 30360 
Phone: 770-448-6650 

Fax: 770-448-8970 

 

 

MAINTENANCE CHECKLIST 

 

BEFORE DEPLOYMENT 

 

Check the battery voltage level of each sign before deploying it. 

If 

the batteries are not fully charged then 

charge the batteries with AC power until a full charge is achieved. 

 

WEEKLY 

 

Clear/clean solar panels on deployed signs. A push broom should be sufficient to clear off most debris or 
snow. Ice should be removed ASAP by applying warm water. Wipe off the cells with rags or paper 
towels if there is considerable buildup. Do not use industrial cleaner. 

 

MONTHLY 

 

Check the batteries. Make sure there is plenty of distilled water in every cell of every battery. Check the 
poles of the batteries for buildup - Coca-Cola scrubbed with a wire brush is a quick remedy for 
removing buildup; applying Vaseline to the poles is a good preventive  measure. 

 

SEASONAL STORAGE 

 

Fully charge and fully deplete batteries while in storage. 

If 

the sign is in storage for longer than a month, 

take the following measures to insure optimal battery and sign performance: 

1.

 

Blank the sign display. 

2.

 

On a full battery charge, leave the sign unused for 30 days. 

3.

 

Use the AC adapter to charge the batteries for 2 days. 

4.

 

Repeat the 30/2 cycle for the duration of storage. 

 

Letting the batteries die for an extended period of time may prevent them from holding a charge again. 

In a blanked state, the batteries may last longer than 30 days before running out of a charge, but we 
schedule the charging to coincide with regular monthly maintenance for user convenience. Also, when 
pulling a sign in from the field for either storage or maintenance the user may notice the mast is rusted 
and/or 

dry 

from being exposed to weather. DO NOT lubricate the mast to assist in the lowering process. 

If 

hydraulic operation is not possible for some reason, call our Service Department immediately. 

 

 

Refer to sections 2.3, 3.4, and 4.3 of the Service and Maintenance Manual for detailed information. 

 

YouTube maintenance video: https://www.youtube.com/watch?v=o2vs4yWJ2Bc 

 

If 

you have questions you can contact the Amsig Service Department at 770.448.6650 ext 3 or 

[email protected]

 
 
 

AMERICAN SIGNAL COMPANY 

Содержание Portable Changeable Message Sign

Страница 1: ...Information for Message Display Passwords Settings Web Training via YouTube Page 2 How to set up a Sequence of Messages using the Handheld Controller Page 3 Solar Panel Assembly Quick Recharge of Battery description Page 4 Message Sign Maintenance Checklist and Storage Information Web Training via YouTube Page 5 Battery Maintenance Full Instruction Manufacturer Instruction ...

Страница 2: ...ed then the message is automatically saved in the next available CHANGEABLE message slot and ACTIVATED on the sign Press the BLANK switch inside the control cabinet to display the activated message Note The message will be formatted according to the default message settings font size alignment on off time etc The default message settings can be changed in the ADMIN menu Individual message settings...

Страница 3: ...ing each message From the Messages menu scrollto Sequences select ENTER and press Ent er In the Sequences menu select ADD and press Enter Scroll and select desired message and press Enter Repeat this step until alldesired messages have been selected Added Sequences will be stored as new changeable messages Once completed return to home screen then select messages and press Enter Select Changeable ...

Страница 4: ...length duration of message displayed the brightness level the number of Solar Panels the amount of available sunlight the number of Batteries the age of the Batteries and the ambient temperature voltage level of the Battery pack can eventually drop below 11 2VDC Default and the VMS will stop operating At that time or sooner if desired it will be necessary to recharge the Batteries with 120VAC from...

Страница 5: ...age for longer than a month take the following measures to insure optimal battery and sign performance 1 Blank the sign display 2 On a full battery charge leave the sign unused for 30 days 3 Use the AC adapter to charge the batteries for 2 days 4 Repeat the 30 2 cycle for the duration of storage Letting the batteries die for an extended period of time may prevent them from holding a charge again I...

Страница 6: ... in the batteries boiling over during equalization Close the battery caps Charge the battery to full capacity Open the caps on the battery Add distilled water until the electrolyte level is 1 4 from the bottom of the vent well Over filling can result in the batteries boiling over during equalization Close the battery caps If any water was added or it has been over 1 month since the last equalizati...

Отзывы: