
Copyright 2021 Ampt LLC.
All rights reserved.
23
String Optimizer V1500-20 Platform
Installation Manual: 57070012-1 J
6.
Connect the series of modules for Input 1 to the String Optimizer. Ensure that the
locking mechanisms on the connectors are fully engaged.
Figure 10: Connecting Input 1
7.
Follow your procedures and safety protocols to measure the voltage and verify the
polarity for the string of modules being connected to Input 2. See Figure 9.
8.
Connect the series of modules for Input 2 to the String Optimizer. Ensure that the
locking mechanisms on the connectors are fully engaged.
Figure 11: Connecting Input 2
Содержание 31570020-1200
Страница 1: ...Ampt String Optimizer V1500 20 20 V1500 20 16 Installation Manual 57070012 1 J 2021 Ampt LLC ...
Страница 10: ......
Страница 28: ......
Страница 37: ......