1 of 4
™
Rev 2
®
安装步骤
‐
2.5mm²/4mm²
线缆
Assembly
Instructions
‐
2.5mm²/4mm²
Cable
1.选择符合以下要求的屏蔽线缆。
Choose
proper
shielding
cable;
2.
按尺寸剥开电线外套、屏蔽层及绝缘皮,并剪掉多余屏蔽线。
Strip
jacket,
braiding
wire,
insulation,
fold
back
braiding
wire
as
shown
below.
PowerLok4.0
2
芯 组装式插头安装规范
PowerLok4.0
2
Pos Connector
Assembly
SPEC
线缆规格 Cable Size
直径 OD (mm)
剥皮尺寸 Peeling Size“A”(mm)
2.5mm² or 14AWG
5.2±0.2
8.5±1
4mm² or 12AWG
5.8±0.2
9.5±1
3. 在屏蔽层上套上铜套,铜套需套到底,套上铜套后屏蔽线不能露出。
Load
copper
ferrule
onto
braiding
wire
to
bottom.
Visual
check
to
make
sure
there
is
no
loose
shielding
strands
uncovered.
PL
‐
02AI
‐
002
Rev
2