AMP Research 75104-01A Скачать руководство пользователя страница 2

www.amp-research.com

2/12

IM75104 rev 09.19.12

A M P   R E S E A R C H   P O W E R S T E P

T M

  –   F O R D   S U P E R   D U T Y   &   E X C U R S I O N

INSTALLATION GUIDE

Attaching motor to linkage assembly

The motors must be attached to the linkage assemblies before continuing the 

installation process.

CAUTION: HANDLE WITH CARE.

To ensure our customers receive all components with full integrity, we pack 

the motors separate from their linkage assemblies. This requires that the 

installer position and fasten the motor before continuing with the install. 

Please follow the instructions below and handle the assembly carefully.

CAUTION: Dropping the assembly or any excessive impact MAY cause 

damage to the motor.

Instructions:

1. Position the gear cover in place as shown if not already in place.

2. Seat motor into position on the three mounting bosses. This may require 

an adjustment of the gear by moving the swing arms.

3. After seating into place, fasten the motor with the three motor mount 

screws with 4mm Hex Head. Tighten screws to 36 in-lbs (4N-m). 

Do not 

over torque.

EXPLODED VIEW

80-03129-90    

Motor

19-03179-90   

Socket cap screw

19-03133-90    

Washer

19-03138-90   

Drive Gear Housing Cover

Содержание 75104-01A

Страница 1: ...RED q Safety goggles q Measuring tape q Flat blade screwdriver q Phillips head screwdriver q 13mm socket q 8mm socket q Ratchet wrench and extension q Wire crimpers q Wire stripper cutter q 3 16 hex k...

Страница 2: ...nd fasten the motor before continuing with the install Please follow the instructions below and handle the assembly carefully CAUTION Dropping the assembly or any excessive impact MAY cause damage to...

Страница 3: ...quire modification Application Cut Length Crew Cab Excursion 79 No Modification Required Super Cab 60 Trim 19 Regular Cab 48 Trim 31 5 2 x2 10 02641 14 Idler linkage assembly 3 x2 10 02624 14 Motor li...

Страница 4: ...Cable tie 11 10 x8 19 02802 90 Socket cap screw 11 x8 19 02488 90 U nut 12 x8 19 02486 90 Washer stainless 13 x8 16 03014 90 Washer black 14 x25 19 02805 90 Cable tie 7 15 19 02992 90 Tubing installa...

Страница 5: ...C H P O W E R S T E P T M F O R D S U P E R D U T Y E X C U R S I O N 1 2 3 4 5 DRIVING ASSEMBLY IDLER ASSEMBLY FRONT Driver Side 7 15 12 8 14 7 2 2 8 2 TORQUE 16 ft lbs 22 N m Note Excursion requires...

Страница 6: ...U R S I O N 6 7 8 9 10 5 9 Loop two large tie wraps through fastener cutouts in sheet metal as shown Position controller as shown above and cinch down tie wraps to secure controller in place Connect...

Страница 7: ...ad trigger wire Remove kick plate Roll back carpet See Detail 14 6 wire bundle TRIGGER WIRE See Wiring Guides for wiring details 18 Connecting Wire or leg of Double Diode 6 Roll back carpet See Detail...

Страница 8: ...R E S E A R C H P O W E R S T E P T M F O R D S U P E R D U T Y E X C U R S I O N 16 17 18 19 20 21 Remove door light Remove speaker screws See Detail 22 Pull back door lining NOTE Steps 16 25 removin...

Страница 9: ...8 See wiring guides and step by step instrctions colors and preceedures will vary per model year Connecting Wire Door Ajar Wire 15 Insert plastic tube 15 CONNECTING WIRE 15 To rear wire splicing CONNE...

Страница 10: ...T M F O R D S U P E R D U T Y E X C U R S I O N 28 29 30 31 32 33 28 29 30 32 31 33 4 4 3 4 3 2 2 1 10 27 65 On each side of the vehicle measure from the front edge of door line on the pinch weld to...

Отзывы: