Ammara Designs PBS-RGH Скачать руководство пользователя страница 3

PBS-RGH

Installation Instructions

2

3

15121422-A 2

15121422-A 

3

3

Using mounting holes secure the 
valve making sure the “UP” label 
outlet is on top.

If you are making a back-to-back 
installation (hot on right and cold on 
the left) 

,

install the back valve body 

as described in steps #5 – #6.
If not, go to step #7.   NOTE: Notice 
that the back valve has hot and cold 
indicators that will be opposite of the 
incoming supply lines.

4

5

Remove the cartridge and stem 
assembly. Notice that the pin is at 
the top. Rotate the cartridge 180°. 
The pin should be on the bottom.

This valve is designed to fit into a 
wall that is 2 7/8

 to 3 7/8

 from 

finished wall to the back of the valve.  
Extensions are shipped with the trim 
if necessary.

1

2 7/8

 - 3 7/8

2

Turn off the water supplies.Install the 
valve so the finished wall will fit 
between the markers on the mud 
guard.

2

2 7/8

-3 7/8

6

Align the pins on the bottom of the 
cartridge and push the cartridge into 
the valve.  Make sure the cartridge is 
firmly installed into the valve body. 
Reinstall stem assembly with mud 
guard.

7

Connect valve body to water supplies using the proper fittings . 
 Warning: avoid soldering at high temperature.  Exposure to high 
temperature may damage the cartridge.  Be sure stops and pressure balance 
cartridge are removed before soldering.

8

Connect the valve body to the shower 
outlet with the proper fillting.Note: it 
is suggested that you anchor all water 
lines.

Stops

Pressure Balance 
Cartridge

Warning

Mounting 
hole

Mounting hole

Hot

Left

Right

Back valve

Back valve

Cold

2

9

1

.

Pressure test and flush the valve. 

   a. Prior to testing, remove mud guard, stem assembly, cartridge as stops as shown.  
   b. Plug the shower outlet and check for leaks.
   c. After testing, flush system.
   d. Remove shower outlet plug. Re-install the stops, cartridge, stem assembly and mud guard. 
2.Check for leaks.

 Installation completed.

10

a

b

c

d

Cartridge

Rotate 180°

Pin

Pin

Pin

Valve

Cartridge

Red

Red

Red

Blue

Blue

Blue

Содержание PBS-RGH

Страница 1: ...mensions PBS RGH Replacement Parts 15121422 A 4 NO Description Part No 1 End Cap 5T1C0138NT 2 3 Stop Valve 9Q1152NT 5L0C0861NT 4 Pressure Balance Cartridge 5D0M0262PL 5 Sleeve 9Q1173NT 6 Cartridge Nut 5T1C0216NT Sten Threaded Nipple IAPMO certified to meet or exceed the following ASME A112 18 1 CSA B125 1 Uniform Plumbing Code National Plumbing Code of Canada ASSE 1016 2 7 8 3 7 8 1 13 16 213 16 5...

Страница 2: ...he pins on the bottom of the cartridge and push the cartridge into the valve Make sure the cartridge is firmly installed into the valve body Reinstall stem assembly with mud guard 7 Connect valve body to water supplies using the proper fittings Warning avoid soldering at high temperature Exposure to high temperature may damage the cartridge Be sure stops and pressure balance cartridge are removed ...

Страница 3: ...he pins on the bottom of the cartridge and push the cartridge into the valve Make sure the cartridge is firmly installed into the valve body Reinstall stem assembly with mud guard 7 Connect valve body to water supplies using the proper fittings Warning avoid soldering at high temperature Exposure to high temperature may damage the cartridge Be sure stops and pressure balance cartridge are removed ...

Страница 4: ...mensions PBS RGH Replacement Parts 15121422 A 4 NO Description Part No 1 End Cap 5T1C0138NT 2 3 Stop Valve 9Q1152NT 5L0C0861NT 4 Pressure Balance Cartridge 5D0M0262PL 5 Sleeve 9Q1173NT 6 Cartridge Nut 5T1C0216NT Sten Threaded Nipple IAPMO certified to meet or exceed the following ASME A112 18 1 CSA B125 1 Uniform Plumbing Code National Plumbing Code of Canada ASSE 1016 2 7 8 3 7 8 1 13 16 213 16 5...

Отзывы: