
21
d. After the platform P1 and P2 were confirmed of acting synchronously, idling test should
be done for a complete route of lifting and lowering, and then test with car.
e. Once the lift cannot be lowered from the highest position while press
DOWN
during
idling test , turn the 2pcs shutoff valves quickly into oil filling position (Fig.32), then
quickly to normal working position (Fig.33).
Note: This operation of turning the handles should be finished quickly, non-stop.
VI. OPERATION INSTRUCTIONS
To lift vehicle
1. Keep clean of site near the lift, and down the lift to the lowest position;
2. Drive vehicle to the platform and put on the brake;
3. Turn on the power and push the button
UP
,
raise the lift to the working position;
Note: make sure the vehicle is steady when the lift is raised
4. Make sure the platforms are in the same level before working then turn off the
power switch
To lower vehicle
1. Cleaning the obstacles around or under the lift, and make sure no people around
under the lift.
2. Turn on the power switch, push the down button
Down
to lower the lift, the lift is
Fig.31
Содержание MRL09
Страница 1: ...Original MID RISED SCISSORS LIFT Model MRL09 ...
Страница 26: ...24 ...