Ametek CHANDLER ENGINEERING 7360V Скачать руководство пользователя страница 17

SECTION 3 

 OPERATION     3-3  

 
 

 

Running the Test 

If necessary, press the RESET button to reset the TEMPERATURE LIMIT ALARM. 
 
Make certain the FILL CYLINDER switch is in the ON position; the HEATER switch is in 
the ON position; and the COOL CYLINDER switch is in the OFF position. 
 
Also make certain the CYLINDER DRAIN valve is closed and the cylinder is filled with 
water. 
 
Program and start the Temperature Controller. 
 
Use the PRESSURIZE CYINDER switch to increase the cylinder pressure to the desired 
level, if necessary.  The PRESSURIZE CYLINDER switch may be left in the ON position to 
maintain a minimum pressure if the PUMP PRESSURE ADJUST regulator has been set as 
outlined in the 

Pressure Control

 section. 

 

If Temperature Limit Alarm Occurs 

If the cylinder exceeds its maximum operating temperature, a TEMPERATURE LIMIT 
ALARM will occur.  When this alarm occurs, the yellow pushbutton switch will light and the 
heaters will cease to operate.  The only way to reset this alarm is by pressing the lighted 
switch on the front panel.  If a TEMPERATURE LIMIT ALARM occurs, the instrument 
should not be operated again until the reason for the alarm is found and corrected. 
 

Cooling the Cylinder 

The 7360V Vertical Curing Chamber is equipped with internal cooling coils for rapid 
cylinder cooling at the completion of a test.  The following is the procedure for cylinder 
cooling. 
 
1.

 

Make certain that the PUMP PRESSURE ADJUST regulator has been set so that 
pressure in the cylinder is maintained at 1600 psi/11 MPa or greater until the temperature 
of the cylinder is below 200°F/93°C.  This will prevent water in the cylinder from 
flashing into steam. 

 
2.

 

Turn the PRESSURIZE CYLINDER switch to the ON position if it is not already in the 
ON position. 

 
3.

 

Turn the HEATER switch to the OFF position. 

 
4.

 

Turn the COOL CYLINDER switch to the ON position. 

 
5.

 

Press the F1 button (Automatic / Manual Mode) on the Temperature Controller. 

 

Содержание CHANDLER ENGINEERING 7360V

Страница 1: ...DEL 7360V VERTICAL CURING CHAMBER Revision G APRIL 2021 98 0520 S N ____________ 2001 N Indianwood Ave Tulsa Oklahoma 74012 U S A TEL 918 250 7200 FAX 918 459 0165 E mail chandler sales ametek com Web...

Страница 2: ...publisher assumes no responsibility for errors or omissions Neither is any liability assumed for damages resulting from the use of the information contained herein This publication contains the follo...

Страница 3: ...dures 2 1 Power Switch 2 1 Model 7050 Temperature Controller 2 1 Drain Cylinder Fill Cylinder switch 2 2 Heater Switch 2 2 Pressurize Cylinder Switch 2 2 Cool Cylinder Switch 2 2 Cylinder Drain Valve...

Страница 4: ...T i i TABLE OF CONTENTS Section 4 Maintenance and Servicing 4 1 Maintenance 4 1 Troubleshooting 4 1 Section 5 Replacement Parts 5 1 Section 6 Drawings and Schematics 6 1...

Страница 5: ...essure in the instrument above a desired lower limit If the instrument pressure drops below the lower limit the pump will increase the pressure back up above the lower limit High temperature alarm If...

Страница 6: ...fication The primary high pressure sealing element is the metal seal ring 2 As the pressure inside the cylinder increases the seal ring is wedged between the plug 1 and the cylinder forming a tight me...

Страница 7: ...seal failure and the release of hot water or steam Where to Find Help In the event of problems the local sales representatives will be able to help or the personnel at Chandler Engineering can be cont...

Страница 8: ......

Страница 9: ...is also required at pressures between 20 and 40 psi 135 275 kPa All air water and steam fittings have inch NPT threads Connect air supply line to the fitting on the rear of the instrument marked AIR...

Страница 10: ...be connected to an appropriately rated power source The earth ground connection on the rear of the instrument should be connected to a metal water pipe a metal rod driven in the ground or other approp...

Страница 11: ...w plug O ring if the cylinder temperature has exceeded 350 F 177 C Control Panel Functions Figure 2 shows how the front control panel is designed You may find it convenient to refer to this figure as...

Страница 12: ...switch The COOL CYLINDER switch controls the flow of water to the internal cooling coils This switch should always be in the OFF position during a test and then switched to the ON position at the comp...

Страница 13: ...vel The PUMP PRESSURE ADJUST may also be used to slowly and quietly increase the cylinder pressure This is done by turning the PUMP PRESSURE ADJUST knob clockwise while the PRESSURIZE CYLINDER switch...

Страница 14: ......

Страница 15: ...en thoroughly lubricated with Moly grease or similar high temperature lubricant Note Install a new O ring after any test in which the temperature exceeds 350 F 177 C Check internal O ring on bottom of...

Страница 16: ...The trapped air can be removed by loosening the 5 8 hex plug in the top of the cylinder 3 Turn the HIGH PRESSURE LIMIT REGULATOR knob out counterclockwise until the pressure begins to drop The upper l...

Страница 17: ...curs the yellow pushbutton switch will light and the heaters will cease to operate The only way to reset this alarm is by pressing the lighted switch on the front panel If a TEMPERATURE LIMIT ALARM oc...

Страница 18: ...ter to steam Draining the Cylinder 1 Turn all valves to the OFF position 2 Turn the PRESSURIZE CYLINDER and FILL CYLINDER switches to the OFF position 3 Open the CYLINDER DRAIN valve 4 Turn the DRAIN...

Страница 19: ...ce Make certain that the plug and cylinder threads are clean and well lubricated with Moly grease or other high temperature lubricant Check the internal plug O ring periodically for cuts tears or dete...

Страница 20: ...locked with cement Leak in cylinder or tubing Damaged valve or pressure regulator seat Pressure regulator is blocked with cement Wrong tuning parameters Malfunctioning controller High Pressure Limit r...

Страница 21: ...ing Coil Cylinder Assembly 98 0210 Mold Assembly 98 0500 Cabinet Assembly 98 0505 Cylinder Mounting Base 98 0506 Cylinder Base 98 0506 Pressure Gauge 98 0511 Top Panel 98 0512 Cylinder Mounting Ring 9...

Страница 22: ......

Страница 23: ...SECTION 6 DRAWINGS AND SCHEMATICS 6 1 Section 6 Drawings and Schematics Drawing Number Description 98 0006 Piping Schematic 98 0518 Wiring Diagram...

Страница 24: ...CHANDLER ENGINEERING...

Страница 25: ......

Страница 26: ...ften are ________________________________________________ ______________________________________________________________________________ Other comments ________________________________________________...

Страница 27: ...cut out postcards on dotted lines...

Страница 28: ...bnormal usage faulty installation im proper maintenance or any repairs other than those provided by authorized Chandler Engineering personnel This warranty is in lieu of all other warranties expressed...

Отзывы: