AmeriGlide | www.ameriglide.com | 866-294-4460
6
Escort Stair Lift Installation Manual
PREPARING THE RAIL
Preparation
GETTING TO KNOW THE RAIL
3
1
2
8
4
5
9
7
5
11
10
10
6
1
1. Gear Rack Fastener Channel
The gear rack is fastened using a
9/64" hex wrench to tighten the
set screws to the plate. The plate
slides into the channel. The gear
rack will sit inside channel 2" in
order to allow for contact with the
pinion gear.
7. Negative Charging Strip
Channel
Negative charging strip will rest
inside these channels.
8. End Cap Screw Channels
Use these to fasten the end caps
onto the rail.
9. Main Interior Wire Channel
Used for running wiring up and
down the rail.
10. Splice Bar Channels
Slide splice bars into these
channels when connecting two or
more sections of rail.
11. Rail Bracket Channels
Rail brackets attach to the rail
using these channels.
2. Pinion Gear Channels
These channels allow for the gear
rack and pinion gear to interact.
3. Guide Wheel Channel
The lower portion is where the
Guide wheels will ride in this
channel.
4. Limit Cam Fastener Channel
The limit cams are attached to
the rail by screwing the supplied
10-24 screws and square nuts.
The square nut will slide into this
channel and tightened.
5. Chassis Wheel Channels
The chassis wheels will ride
up and down the rail in these
channels.
6. Positive Charging Strip
Channel
Positive charging strip will rest
inside these channels.
8
11