4
Rules for Safe Operation and Installation
**PLEASE READ ALL INFORMATION ON THIS PAGE BEFORE INSTALLATION**
This appliance must be installed in accordance with local codes.
Installation is to be performed by a qualified installer, according to state and local codes.
Maintain adequate minimum clearances to combustible materials. (See Figure 2)
Install in an area with adequate air for combustion and ventilation; 60 cubic feet per minute minimum.
Minimum clearances to combustibles for the AMERICAS HEAT® boiler is 24” from the top, open
front, 30” on both sides and 18” from the rear. The AMERICAS HEAT® boiler is to be installed on
noncombustible flooring. (See Figure 2)
Do not connect this unit to a chimney flue serving another appliance.
Disconnect all power to the unit before performing routine maintenance or service. Before servicing,
allow the unit to cool.
Establish a regular service and maintenance schedule for efficiency and safe operation. Have a
qualified service person perform tasks you are not familiar with.
DANGER: Risk of fire or explosion. Do not burn garbage, gasoline, drain oils, or other flammable
liquids.
WARNING: Risk of Fire
Do not operate with flue draft exceeding .04” water column.
Do not use chemicals to start unit firing
Do not burn garbage, gasoline, drain oils, or other flammable liquids.
Do not operate with fuel loading or ash removal doors open.
Do not store fuel or other combustible material within marked installation clearances.
Inspect and clean flues and chimney regularly.
CAUTION: Children and adults should be alerted to the potential high surface temperatures of the
burner door; Keep children away!
Do not place clothing or other flammable material on or near this appliance.
Ashes should be placed in a metal container with a tight fitting lid. The closed container of ashes
should be placed on a non-combustible floor or on the ground, well away from all combustible
materials pending final disposal. If the ashes are disposed of by burial in soil or otherwise dispersed,
they should be retained in the closed container unit until all clinkers have thoroughly cooled.
CAUTION: Make sure all fittings and controls are tight before introducing water to the boiler.
All units require a dump zone to distribute a low fire B.T.U.
Содержание AHB-170P
Страница 8: ...7 Figure 2 Minimum Clearances ...
Страница 9: ...8 ...
Страница 10: ...9 Figure 3 Barometric Draft Controls ...
Страница 20: ...19 Hopper Auger Figure 8 Hopper Auger Parts ...
Страница 22: ...21 Wiring Schematic for America s Heat AHB 100 170 Boiler Figure 10 Wiring Schematic ...