American Standart Flash R950 Скачать руководство пользователя страница 2

- 2 -

M965925 (5/18)

• 

Note: Refer to Roughing-in Dimensions on page 1 for additional information.

• Adequate floor support is required. The WOOD SUPPORT 

(1)

 must be a minimum of 2" (51 mm) thick by 10" (254 mm) wide.

   

2x6 lumber is NOT adequate for this application.

• Locate WOOD SUPPORT 

(1)

 between floor joists keeping a minimum distance of 2-3/4" (70 mm) from the top surface of

   wood support to the finished floor.

• 

IMPORTANT: Use a ROUND BUBBLE LEVEL (2) to level the WOOD SUPPORT (1). The WOOD SUPPORT (1) must

   be perfectly level. Secure WOOD SUPPORT (1) to floor joists. Check for level again.

• Sweat together Hot and Cold Supply assemblies.  Apply sealing tape to threaded connections. Thread supply assemblies
   into rough-in valve inlets. The Hot inlet will be on the left when facing the front of the Tub Filler.

Note: The Hot and Cold inlets are marked on the maniflod. See View “A”.

 

 

1

INSTALL HOT AND COLD WATER SUPPLIES

INSTALL TUB FILLER FLOOR SUPPORT 

2

FRONT

Turn off hot and cold water

supplies before beginning.

CAUTION

FINISHED FLOOR LINE

2-3/4

" (70mm) 

MIN.

FLOOR JOIST

2

 ROUND BUBBLE LEVEL

1

 

WOOD SUPPORT

10" (254mm) MIN.

2" (51mm) MIN.

10"-12" (254-305mm)

HOT 

COLD

SEALING

TAPE

SUPPLY

ASSEMBLY

FRONT

HOT 

COLD

View “A”

Отзывы: